Permits & Design – San Diego
Is San Diego’s Preliminary Review Worth It Before You Design Your Remodel? (2026)
San Diego’s Development Services Department will answer up to ten specific questions about your remodel or addition for a flat fee, before you spend money on full construction drawings. Here is exactly what Preliminary Review costs, what it does and doesn’t guarantee, and when it is worth paying for.
Updated November 2026
9 min read
Key takeaways
- A Single Discipline Preliminary Review costs $1,588.73 plus a $12.16 mapping fee, for up to four hours of staff time and up to ten written questions on one topic — hillside grading, means of egress, a setback question.
- A Multiple Discipline Review costs $12,983.99 plus the mapping fee, with an assigned Development Project Manager coordinating several City departments on one application.
- You get 30 calendar days to respond to the City’s comments. Miss it, and the application is automatically closed — the fee is not refunded.
- The written answer doesn’t approve anything. It is good for one year, it isn’t appealable, and the fee is never credited toward your actual plan-check or permit.
- Full plan check and inspection for an addition or remodel to a single-family home starts at $3,512.92 (plan check) plus $2,228.29 (inspection), before any per-square-foot increment.
In this guide
1. What Preliminary Review Actually Is
Preliminary Review is a paid, structured way to get the City of San Diego’s written answer to specific code or zoning questions before you spend money on full construction drawings. It is run by the Development Services Department under Information Bulletin 513, and it exists for exactly one situation: you have a real, specific unknown — a hillside lot, an odd setback, a means-of-egress question — and guessing wrong in your design would be expensive to fix later.
It comes in two formats. A Single Discipline review routes your question to the one department that owns it: a hillside question goes to Planning, a structural means-of-egress question goes to Structural, a grading question goes to Engineering. A Multiple Discipline review assigns a Development Project Manager to coordinate an answer across several departments at once. The bulletin is explicit on one point that matters more than any fee: “Preliminary Review is not a comprehensive plan review.” It answers the questions you ask. It does not evaluate your whole project.
2. Single Discipline vs. Multiple Discipline
Most single-family remodel and addition questions fit the Single Discipline format. You pick it when one department can answer your question on its own. Multiple Discipline exists for projects where the questions genuinely cross departments — a hillside addition with a parking question and a historical-review question, for example — and it costs roughly eight times as much because you are paying for coordinated staff time across several teams, not just one.
A separate “SB 330” track exists inside the same bulletin for qualifying housing projects, but it only applies to residential developments of two or more units, mixed-use projects where at least two-thirds of the square footage is residential, or transitional and supportive housing — not a typical single-family remodel or addition.
| Review type | What it’s for | Flat fee | What’s included |
|---|---|---|---|
| Single Discipline | One question answered by one department | $1,588.73 | Up to 4 hours of staff time, up to 10 written questions |
| Multiple Discipline | Questions that cross departments | $12,983.99 | Up to 4 hours per discipline, with an assigned Development Project Manager |
| SB 330 Preliminary Application | Qualifying 2+ unit housing projects only, program runs through Jan. 1, 2034 | Same fees as above by type | Vests development regulations for 180 days after the City responds |
3. What It Costs, Line by Item
The flat fee is only the starting point. Information Bulletin 513 lists several add-ons that apply once you go beyond the basics — worth knowing before you submit, not after.
| Fee item | Amount | Applies when |
|---|---|---|
| Single Discipline flat fee | $1,588.73 | Base cost of one Single Discipline application |
| Multiple Discipline flat fee | $12,983.99 | Base cost of one Multiple Discipline application |
| Mapping fee | $12.16 | Charged once per application, either type |
| Additional staff time | $88.29 first half hour, then $17.71 per 6 minutes | Once the included 4 hours (or 4 hours per discipline) are used up |
| Optional review meeting | Billed per reviewer, 30-min. minimum | If you request a live meeting (held on Microsoft Teams) instead of relying on the written response alone |
| Fire Plan Review add-on | $327.00 | Only if you add Fire as a reviewing discipline |
4. The Rules That Can Cost You the Fee
Preliminary Review is less forgiving than a typical permit submittal. A handful of rules in Information Bulletin 513 decide whether your money gets you a useful answer or a closed file.
- Ten questions, no more. Multi-part questions count as separate questions, and you can’t add any after you submit.
- A 30-calendar-day clock. After the City responds with comments, you have 30 calendar days to reply with clarifications. An application that goes unanswered is automatically finalized and closed.
- No resubmittals. Staff’s response is final. You cannot use a Preliminary Review to redesign, change scope, or get a second opinion on the same question.
- A one-year shelf life. The answer is only valid for one year from the deemed-complete date — relevant if your design or financing stalls.
- It is not an approval. The bulletin states plainly that Preliminary Review “is not a comprehensive plan review,” and the fee is never credited toward your eventual plan-check or permit.
Miss the 30-day window to respond to the City’s comments, and San Diego Development Services automatically closes your Preliminary Review application. The fee is not refunded, and the written answer you were waiting on never arrives. (Source: Information Bulletin 513.)
5. Preliminary Review vs. Paying for Plan Check
Because the fee isn’t credited toward anything, it helps to see it next to what a real plan-check submittal costs for the same type of project. For an addition or remodel to a single dwelling unit, Information Bulletin 501’s “Res-SDU/DUP Add/Remodel” schedule sets the base rates below, before any per-square-foot increment is added for a larger project.
| Preliminary Review (Single Discipline) | Full plan check + inspection* | |
|---|---|---|
| Base cost | $1,588.73 + $12.16 mapping | $3,512.92 plan check + $2,228.29 inspection |
| What you receive | A written answer to up to 10 specific questions | A reviewable, buildable permit |
| Counts toward your permit fee? | No — separate, non-refundable charge | — |
*Base “Res-SDU/DUP Add/Remodel” rate for an addition or remodel to a single-family home, before the per-square-foot increment IB-501 adds beyond the first 500 sq ft. A larger addition costs more on both sides of this table.
6. When It’s Worth Paying For
The fee buys certainty on one narrow point, not a project review. That makes it a good deal in some situations and a waste of money in most others.
- Worth it: a hillside lot, a questionable setback, a possible historical-review trigger, an unusual egress layout, or any other single genuine unknown that could force a redesign if your team guesses wrong — and where being wrong in finished construction drawings would cost far more than $1,600.
- Usually not worth it: a straightforward remodel with no odd site conditions, which describes most kitchen and bathroom projects; a question your design team can already answer from code and precedent; or any situation where what you actually need is a real approval, since only a complete, reviewable permit application gets you that.
For a whole-home remodel or a multi-room addition, the math shifts: the fee is small relative to the total project, and an answer on a load-bearing or setback question before the drawings are finished can save real redesign time later.
7. How to Apply
The process runs through the City’s own portal, not a contractor or architect account.
- Create an account on the City’s Online Permitting Portal (Accela).
- Complete Form DS-375, the Preliminary Review Questionnaire. List each question separately, and for a Multiple Discipline application, specify which department should answer each one.
- Upload whatever plans, surveys, or sketches you already have. Information Bulletin 513 states that the depth of the City’s answer depends mainly on how much detail you give it.
- Pay the flat fee plus the $12.16 mapping fee, then wait for a written response. Budget roughly a month: the bulletin gives two different turnaround figures in two different sections (20 business days in one, 20 calendar days in another), so confirm current processing time with Development Services before counting on a date.
- If something still needs clarifying, you get one optional staff meeting (billed separately) and 30 calendar days to respond to comments before the application automatically closes.
Frequently asked questions
What is Preliminary Review for a San Diego remodel permit?
It is a paid program run by the Development Services Department that gives you a written answer to specific code or zoning questions — up to ten of them — before you finish designing your remodel or addition. It is not a plan check and does not approve a project.
How much does a Preliminary Review cost in San Diego?
A Single Discipline review costs $1,588.73. A Multiple Discipline review, which coordinates several City departments through an assigned project manager, costs $12,983.99. Both add a $12.16 mapping fee. Figures are from Information Bulletin 513, revised September 2026, and are subject to change.
How many questions can I ask in one Preliminary Review application?
Up to ten. Multi-part questions are counted as separate questions toward that limit, and you cannot add more once you’ve submitted.
Does a Preliminary Review guarantee my permit will be approved?
No. Information Bulletin 513 states directly that Preliminary Review is not a comprehensive plan review. The answer you receive isn’t appealable, and the fee is never credited toward your actual plan-check or permit fees.
What happens if I miss the City’s 30-day response deadline?
The City automatically finalizes and closes the application. You do not get a refund, and you do not get the answer you were waiting on.
How long is a Preliminary Review answer good for?
One year from the date the City deems your application complete. After that, you would need to reapply to rely on the same answer.
Have a Site Question Before You Design?
A hillside lot, an older structure, or an odd setback can change what a remodel or addition is even allowed to be. Eco Home Builders handles design, engineering and permitting as part of the same project team, so most of these questions get resolved while your project is being planned, rather than as a separate city fee you pay on your own.
Sources
- City of San Diego Development Services, Information Bulletin 513, “Preliminary Review”, rev. September 2026
- City of San Diego Development Services, Information Bulletin 501, “Fee Schedule for Construction Permits-Structures,” Table 501A, rev. August 2026
- City of San Diego Development Services, Permits overview
Fees and figures cited are drawn from the City of San Diego’s published Information Bulletins as of the revision dates shown and are subject to change; confirm current fees with Development Services before applying. This article explains the City’s own Preliminary Review program and is not legal or engineering advice. It does not state an Eco Home Builders price for design, engineering, or construction services.