Rancho Peñasquitos, CA 92129 · Home remodeling

4 of our 6 completed projects in ZIP 92129 are bathroom remodels, and their final contract values run from $17K to $87K. Permits come from the City of San Diego’s Development Services Department (DSD), because Rancho Peñasquitos is a City of San Diego neighborhood, not a separate city. The rule to check first is the house’s age. A structure 45 years old or older gets a historical screen before a construction permit, and in 2026 that reaches any house built in 1981 or earlier.

Eco Home Builders Inc.Updated October 2026CSLB #1074166Design-build: design, permits and construction
Green stone island with teal glass pendants
Example of our work · San Diego County. Green stone island with teal glass pendants. Work by Eco Home Builders in San Diego County.

Quick facts for Rancho Peñasquitos remodels

  • Cost from our jobs: nine of the 15 bathroom jobs in our records, counting ZIP 92129 and its neighbors, finished between $24K and $43K. The four inside ZIP 92129 ranged from $17K to $87K. See the cost ranges.
  • Permit office: DSD, the City of San Diego’s permitting agency, filed through Accela. Permit path and fees.
  • City review time: a Short job gets its first review in about 8 business days, and each recheck runs about 6. Rapid Review, for qualifying interior work, is 6 days, then 2 per recheck.
  • Check these early: the 45-year historical screen, the fire and slope rules for canyon-rim lots, and the school district, which sets the fee on additions. Local conditions.
  • Our record: six completed jobs inside ZIP 92129, with 21 others in adjacent ZIPs. See the projects.

Planning a project in Rancho Peñasquitos? Start with the parcel address and project scope. We will check the build year and the school district before you set a budget.

Schedule a consultation
6
completed Eco jobs in ZIP 92129
27
completed across 92129 and neighboring ZIPs
4.7★
average Google rating, from 101 reviews
8
business days until a Short job’s first City review

Projects in and around Rancho Peñasquitos

Six completed projects are inside ZIP 92129. Twenty-one more sit in four adjacent ZIPs. The table separates them, since an adjacent ZIP can fall under another permit office.

Wood double vanity with a tall center cabinet

Example of our work · San Diego County

Bathroom remodel example

Wood double vanity with a tall center cabinet. We have completed 4 bathroom remodels in ZIP 92129. The picture comes from another San Diego County project, not from these four.

See more of our projects
Green stone island in a kitchen with wood and white cabinets

Example of our work · San Diego County

Kitchen remodel example

Green stone island in a kitchen with wood and white cabinets. We have completed 1 kitchen in ZIP 92129. The picture shows another San Diego County project, not that kitchen.

See more of our projects
Lit walk-in closet with wood shelving

Example of our work · San Diego County

Whole-home remodel example

Lit walk-in closet with wood shelving. Non-kitchen, non-bath remodels in ZIP 92129 number 1, and this photo is from another San Diego County job.

See more of our projects
Completed Eco projects by area, from our job records as of September 2026. Counts include only closed jobs with at least 80% of the contract paid.
AreaZIPCompletedPermit office
Rancho Peñasquitos921296 jobs: four bath, one kitchen, one remodelDSD (City of San Diego)
Rancho Bernardo921284 jobs: two bath, one remodel, one outdoorCity DSD; some addresses fall outside City limits
Rancho Bernardo921277 jobs: three bath, two kitchen, two remodelCity DSD; some addresses fall outside City limits
Scripps Ranch and Miramar Ranch North921316 jobs: three bath, three remodelCity of San Diego DSD
Mira Mesa921264 jobs: three bath, one remodelCity of San Diego DSD

What a remodel costs in Rancho Peñasquitos

Final value means the signed price plus approved change orders and selection upgrades. Anything the homeowner buys on their own stays out. We have 27 completed jobs in the set: 6 in ZIP 92129 and 21 next door. The ranges draw on all 27, since six jobs alone would not give a dependable spread. Types with too few jobs for a range are shown as individual values.

Contract values for 27 finished Eco jobs in ZIP 92129 and nearby ZIPs, rounded to the closest $1,000.

Bathroom remodel15 projects

Most jobs fell between: $24K–$43K (9 of 15). Spread $17K–$128K.

Kitchen remodel3 projects

Each one: $25K, $60K and $163K, the whole spread. The $60K job is inside ZIP 92129.

Larger remodel (not kitchen or bath)8 projects

Most jobs fell between: $68K–$138K (4 of 8). Spread $25K–$261K.

The 92128 outdoor job, at $12K, is not plotted on any bar.

Bathroom with a black floating vanity and glass shower
Bathroom
Dark wood kitchen with stainless appliances
Dark wood kitchen
Living and dining room with a wall of glass doors
Living
Bathroom, kitchen and whole-home work by Eco Home Builders in San Diego County.

Where the 26 jobs fall by budget

  • Under $100K: 21 jobs. By type, that is 14 bathrooms out of 15, 2 kitchens out of 3 and 5 larger remodels out of 8.
  • $27K or less: six jobs, made up of three bathrooms, one kitchen and two larger remodels.
  • Highest: a larger remodel at $261K, in neighboring ZIP 92127.

Our experience is that budgets usually move after design, once the scope gets bigger. Folding a bathroom into a larger remodel, relocating a wall or stepping up cabinetry each adds cost, and every approved change flows into the final figure. Think of the signed contract as the opening number.

Planning figures for an ADU or an addition

Inside these ZIP codes, completed ADUs and additions are too few to price locally.

Our own ADU work across San Diego County is the clearest guide: garage conversions have generally run $100,000 to $200,000, and new ADUs of about 500 sq ft have run $220,000 to $350,000. Site work, utilities, the finish level and fees move a project within those ranges, so we price each one from its drawings. The table adds our published per-square-foot planning range and an independent benchmark for additions. Neither is a quote for your home.

ADU figures are Eco’s published San Diego planning ranges. Addition figures are the 2025 Cost vs. Value Report, Pacific region; sizes shown are its midrange definitions, and the upscale versions are larger.
ProjectPlanning rangeWhat sits on top in Rancho Peñasquitos
Detached or attached ADU$375–$600 per sq ft for construction, plus $8,000–$25,000 for designCity plan check and inspection, plus the $737.00 General Plan Maintenance Fee
Primary suite addition (24 × 16 ft, about 384 sq ft)$185,431 midrange; $390,895 for the larger upscale versionPlan check and inspection charges. Roughly 384 sq ft keeps the suite below the school-fee trigger of 500 sq ft.
Bathroom addition (6 × 8 ft midrange)$65,326 midrange; $121,772 for the larger upscale versionPlan check and inspection charges. At 6 × 8 ft, this room stays beneath the 500 sq ft school-fee trigger.

Our cost guides break down each type: bathroom pricing, kitchen pricing, ADU pricing and addition pricing. Their permit sections describe the same City of San Diego rules that apply here.

Curbless shower with a linear drain and brass fixtures
Curbless shower with a linear drain and brass fixtures. Work by Eco Home Builders in San Diego County.

Want a number for your own home? Tell us the scope and when the house was built, and we will follow up with a planning figure ahead of design sign-off.

Schedule a consultation

Permits and fees for a Rancho Peñasquitos remodel, step by step

This neighborhood belongs to the City of San Diego. Building permits come from DSD, the City’s permitting agency, and are submitted online through Accela.

Scope decides the track. Work that moves structure, changes walls or touches plumbing fixtures takes a job off the simplest route, so describe the full project at intake rather than in pieces.

City steps for these projects, from DSD Information Bulletins 100, 203 and 580 and its Rapid Review page.
StepWhat happensTime
1. Historical screenApplies once a structure reaches 45 years of age. City staff check for a potentially significant historical resource on the parcel, and this review cannot be done at the counter.10 business days for ministerial work, 20 for discretionary.
2. Initial plan reviewThe tiers DSD uses for single dwelling units. Short covers alterations and additions under 3,000 sq ft that add no density; Medium and Long are the larger tiers.Estimated: Short 8 business days, Medium 10, Long 15. Each recheck 6. Final version 5.
3. Rapid ReviewInterior-only remodels of a single-dwelling home, and first-floor additions up to 750 sq ft. An ADU or JADU can ride along in the scope.6 business days on first submittal; 2 per recheck.
4. No-plan building permitKitchen or bath work with no structural change, no wall framing or exterior wall change, and no added plumbing fixture. You still need a building permit.Plan review is skipped. Historical review still applies where the screen requires it.
5. Permit lifespanA single-family or duplex permit lapses after its term unless work proceeds.3 years from issuance.

These due dates are DSD’s estimates, and the City does not promise them. A parcel can trigger a review that is missing from this table, so raise that with DSD before you commit to dates.

Dining room that opens to a patio through black-framed doors
Dining room that opens to a patio through black-framed doors. Work by Eco Home Builders in San Diego County.

City fee amounts for a remodel here

These figures are the base amounts printed in Information Bulletin 501, dated August 2026. DSD works out the final fee from the plans, so use them as reference points rather than a total.

Base amounts from Information Bulletin 501, dated August 2026. DSD sets the final figures after reviewing plans.
FeeAmount
General Plan Maintenance Fee, paid at application; waived when plan review is not needed$737.00
Plan check, single-dwelling addition or remodel row (includes attached ADUs and JADUs up to 1,100 sq ft, and detached ADUs up to 500 sq ft)$3,512.92 base
Inspection, same row$2,228.29 base
Plan check, larger single-dwelling row (includes detached ADUs over 500 sq ft and attached ADUs or JADUs over 1,100 sq ft)$8,085.26 base
Inspection, larger row$8,401.90 base
Mapping fee, charged on plan submittal$12.16
Collection fee on amounts DSD gathers for other agencies$17.11
Lead Hazard Prevention fee, when the house predates 1978$58.00
Historical review plan check, billed by the hour$177.68 an hour, paid when the permit issues
Seismic fee, billed by valuation13 cents per $1,000 of valuation
Building Standards fee, a state charge collected with the City permit$4 per $100,000 of valuation, $1.00 minimum
White cabinets with brass pulls beside a gas range
White cabinets with brass pulls beside a gas range. Work by Eco Home Builders in San Diego County.

Impact fees (DIF) hinge on a project’s category, its size and its location, using the City’s studies for parks, mobility, library and fire needs. The City’s online calculator takes a parcel number and returns an estimate. We point you there rather than quote a figure here.

Plan check at intake is a separate charge. Each permit gets a non-refundable hourly fee calculated on 2.5 hours of review. It is added at intake to set impact fees and must be paid before review starts. The bulletin prints no dollar amount for it, so we will not guess at one.

Your address sets the school district

The district that serves a lot sets the school fee. Parts of ZIP 92129 fall under different districts, so confirm the district before you price an addition. Local condition 4 covers the steps.

Gaps in the first submittal are what send a plan back. Each recheck on a Short project adds 6 business days, so a complete package is the simplest way to save time. Our remodel timeline guide walks through each clock.

4 neighborhood conditions that change scope and budget

The community plan reports that about 85 percent of the neighborhood was built out by 1991. Within ZIP 92129, the median house dates to 1986, which makes the build year the first fact to pin down.

1. House age and the 45-year screen

Census estimates for ZIP 92129 center on 1986 as the median build year, with 30 percent of homes dating to 1979 or before. Treat those as ZIP-wide figures rather than counts for your block, since the median itself can be off by 1 to 2 years. The 30 percent figure stops at 1979, but any house from 1981 or earlier reaches the 45-year mark in 2026, and that triggers the historical screen before a construction permit. Work that stays inside, or is limited to electrical or plumbing, skips the check if the outside remains untouched.

2. Canyon rims, brush and fire-zone parcels

Some lots sit on canyon rims. The plan asks that building along a rim account for the City’s Brush Management requirements, and it suggests top-of-slope setbacks of 20 to 50 feet depending on the fire severity rating. Those suggestions guide new subdivision layouts; they do not bind a remodel. Remodel rules come from the municipal code and the fire-zone map. Brush rules reach any lot where native or naturalized plants grow within 100 feet of a building, and a fire break must separate the two. Zones follow parcel lines, so check your own address on the City’s map. A newer state map from 2025 also exists, issued by the Office of the State Fire Marshal. Where the parcel is mapped Very High fire hazard, work on a building whose application was deemed complete on or after August 27, 2009 has to meet California Residential Code section R337, with the City’s local amendments. Its scope covers ember-resistant vents, roofing, siding and decking.

Living room with an ocean view and a stone fireplace wall
Living room with an ocean view and a stone fireplace wall. Work by Eco Home Builders in San Diego County.

3. Steep hillsides and sensitive habitat

Environmentally Sensitive Lands rules apply to any proposal on a lot where steep hillsides or sensitive biological resources exist. If any slice of the lot holds one of these conditions, the whole property falls under the rules, even where the building site is flat. For a rear addition on a sloped or habitat lot, ask DSD to review the site first.

4. Which district you are in decides the fee above 500 sq ft

Parts of ZIP 92129 are served by San Diego Unified, and other parts fall under other districts. San Diego Unified says Rancho Peñasquitos is served by other districts, except for streets feeding into Mercy Road. Poway Unified lists Rancho Peñasquitos among its communities and charges $5.38 per square foot of new residential space, the same rate San Diego Unified charges. On the City side, IB 146 exempts added residential space of 500 sq ft or less. Once the added space passes that line, the fee applies to the full added area, not only the portion over 500 sq ft. A 520 sq ft addition would owe $2,798 at $5.38 per square foot. Garages, decks and patios fall outside assessable space. A City address also needs the City’s School Charge Approval Form on file with the district. A mitigation agreement can set a different rate, so call the district before you finalize a budget.

Building an ADU in Rancho Peñasquitos

Information Bulletin 400, dated January 2026, sets the City’s ADU framework. State statutes layer review deadlines on top of it.

Rules for ADUs and JADUs in this neighborhood, drawn from Information Bulletin 400 (January 2026). Items marked (state) come from state law and change over time; confirm against the current code for your parcel.
RuleADUJunior ADU (JADU)
SizeAttached or detached: 150 to 1,200 sq ft. One unit up to 800 sq ft is permitted even on a lot already past its floor area ceiling.150 to 500 sq ft, within an existing or proposed house or an attached garage.
SetbacksAn ADU may sit on the side or rear line if fire separation rules allow it. Where a unit rises past 16 feet beside a residential lot, it must sit 4 feet or more from the side and rear lines. Inside a mapped Very High zone, the 4-foot setback applies whatever the height.Setbacks track the main house.
Height and storiesThe zone’s overall height limit governs. Where only one house is allowed on a lot, a detached ADU is capped at 2 stories.No height rule of its own, since it lives within the existing home.
ParkingOff the coastal overlay, none is required. Inside the Coastal Overlay Zone, a single space may apply only within the Beach Impact Area and beyond transit priority areas; units at or under 500 sq ft are exempt.None required. Turning a garage into a JADU needs no replacement spot, except in that same coastal Beach Impact Area setting.
Occupancy and rentNo owner-occupancy requirement. The minimum lease is 31 consecutive days.On-site owner needed, except when the JADU has its own sanitation.
Count per lotA lot zoned for one home can hold the house, one new ADU, one ADU converted from existing space or an accessory building, and one JADU.Part of that total.
FeesThe $737.00 General Plan Maintenance Fee applies. Impact fees fall away for an ADU below 750 sq ft. School fees come in only past 500 sq ft.The $737.00 General Plan Maintenance Fee applies. School fees come in only past 500 sq ft.
ADU kitchen with a navy island and woven pendants ADU bathroom with a glass shower and wood vanity ADU kitchen with a blue tile backsplash and island

Featured project · San Diego County

A kitchen, a bath and a second kitchen from our county ADU jobs

A navy-island kitchen with woven pendants, a bath with a glass shower and wood vanity, and a blue-tiled kitchen with an island. All three come from our San Diego County jobs, none of them from Rancho Peñasquitos.

How we run an ADU project

Timing follows the plans you bring. Preapproved designs move through in 30 days. For everything else, the completeness letter arrives within 15 business days. If a house already occupies the lot, state law requires a decision on a complete application within 60 days, and silence after 60 days means approval by default. Sixty days is the legal ceiling, not a typical timeframe. No state review deadline is stated for JADUs.

Choosing between an ADU and an addition? Our ADU or addition comparison walks through it, and our ADUs page lays out our approach. A room addition that creates no unit is covered on our room additions page, which takes the project from first sketch through final inspection.

Schedules for a remodel in Rancho Peñasquitos

Design, City review and construction run on separate clocks that overlap. The construction durations below are what we scheduled for past jobs. That is a planning record, not a measure of how long each job ran.

  • Permit review. Estimated first passes run 8, 10 or 15 business days depending on project tier, with 6 days per recheck.
  • Construction. Each figure is a single job’s schedule, so read it as an example, not a norm.
Published City estimates sit beside scheduled construction durations drawn from our job files.
ProjectCity reviewConstruction (scheduled)
Bathroom remodelCity estimates by tier: Short, 8 business days; Medium, 10; Long, 15. Rechecks take 6 days. Interior-only jobs may go through Rapid Review, which runs 6 days, with 2 per recheck.Scheduled for about 2, 7 and 9 weeks, all on jobs in neighboring ZIPs.
Kitchen remodelOne completed kitchen in ZIP 92129 was scheduled for 9 weeks.
Larger remodelScheduled for about 6, 7 and 10 weeks, all in neighboring ZIPs. One was scheduled for 19 weeks.
ADUPreapproved plans: 30 days. Otherwise, a completeness notice within 15 business days, then the state’s 60-day limit.We set the schedule from the approved plans.

Houses past the 45-year line need the historical screen, a separate step covered in the permit table above that adds its own time to the first pass. Each job’s schedule, photos and decisions live in Buildertrend, and progress is checked against that schedule throughout the work.

Black floating vanity beside a glass shower
Black floating vanity beside a glass shower. Work by Eco Home Builders in San Diego County.

What homeowners say

We hold a 4.7-star rating on Google across 101 reviews, and more than 300 reviews across Google, Yelp and Houzz.

None of our Google reviews names this neighborhood, so this page quotes no review. Every review we have received, including the critical ones, is on our Google profile.

Read all of our Google reviews, including the critical ones.

How a project runs from first call to final walkthrough

The same Eco team handles design, the City submittal and construction. That keeps the plans you approve and the plans DSD reviews the same.

  1. Phone consultationWe talk through what you want to change, your timing and your budget range.
  2. In-home meetingAn Eco project director walks the house with you, looks at the space and talks through priorities and budget plainly.
  3. Concept and feasibilityDesign, selections and engineering are resolved before the plans go to DSD.
  4. ConstructionInspections at each stage, with progress, photos and decisions documented in Buildertrend.
  5. Final projectFinal inspection, walkthrough and punch list, and the permit closed out.

What to check before you hire a remodeler here

  • Ask the build year first. A house from 1981 or earlier brings the historical screen into any job that changes its exterior, which can change both the drawings and the calendar.
  • A license you can verify. Look up the number on the CSLB website. Ours is #1074166.
  • A legal deposit. California caps a home improvement down payment at $1,000 or 10% of the contract, whichever is less.
  • Who handles the school fee. Confirm which district serves the address, who files the School Charge Approval Form, and who pays any fee. Written answers to all three belong in the contract file before signature.
Rancho Peñasquitos questions to settle before design

1. Which district serves the address, and will an addition add more than 500 sq ft of assessable space?

2. Is the house from 1981 or earlier, and would the scope alter its exterior?

3. Is the lot in a Very High fire-hazard zone, and is native vegetation within 100 feet?

4. Are there steep slopes or native habitat that would bring in the Environmentally Sensitive Lands rules?

5. Does the lot sit inside the MCAS Miramar airport influence area, and is the work interior-only?

White kitchen with brass pulls and a quartz island
White kitchen with brass pulls and a quartz island. Work by Eco Home Builders in San Diego County.

Rancho Peñasquitos remodeling FAQ

Will a kitchen or bathroom remodel here go through plan review?

Sometimes not. A kitchen or bath job in a house or condo can get its permit issued without review when nothing structural moves, no wall framing or exterior wall changes, and no plumbing fixture is added. You still pull the permit. Relocating a fixture or opening a wall moves the job back onto the plan-review track. If any building on the lot has reached 45 years, DSD still reviews the plans for history unless the scope is exempt.

What rules apply to a canyon-rim lot?

Brush rules can reach a building when native or naturalized growth lies inside 100 feet, and an addition that reaches into a brush zone must follow them. A parcel mapped as Very High fire hazard must use R337 materials on additions. Steep slopes or sensitive habitat bring the Environmentally Sensitive Lands rules across the full lot. Local condition 2 covers the details.

Does the MCAS Miramar airport area affect a remodel here?

The community plan says the MCAS Miramar airport influence area touches Rancho Peñasquitos. Where a parcel sits inside it, the airport land use overlay reviews new development. Interior-only changes, and exterior repairs that leave intensity, density, floor area ratio and height unchanged, are exempt. Because the boundary follows parcels, ask DSD whether your lot is inside it.

Which school fee would an addition in Rancho Peñasquitos owe?

An addition that adds 500 square feet of assessable space or less pays nothing to the district. Once the added space passes 500 square feet, the district charges on all of it. San Diego Unified and Poway Unified both publish $5.38 per square foot, and the district for your street is the one that bills you. Local condition 4 shows how to check it.

What does a bathroom remodel run in Rancho Peñasquitos?

Across 15 bathroom jobs in ZIP 92129 and its neighbors, 9 finished between $24K and $43K. The four inside ZIP 92129 finished at $17K, $35K, $71K and $87K. The full spread runs from $17K to $128K, and the $128K job sits far above the rest, so send us your scope if you want a number built for your house.

How much does a kitchen remodel cost in Rancho Peñasquitos?

Three of our kitchens fall in ZIP 92129 or its neighbors. The one inside ZIP 92129 finished at $60K, and the other two landed at $25K and $163K. A spread that wide means no average is useful here. Send us your layout and finish list, and we will give you a number built on your scope.

Is $300,000 enough to renovate a house in Rancho Peñasquitos?

No completed job of ours, out of 27 across all types, reached $300K. The highest closed at $261K in neighboring ZIP 92127. Nothing in that list prices your house, so pin any $300,000 plan to a written scope first.

What is the ADU cap per lot in this neighborhood?

Zoning sets the cap. In a single-dwelling zone, one lot can carry the main house, one new ADU, one ADU carved from existing space or an accessory building, and one JADU. Check your zone on the City’s portal before you draw anything.

More Rancho Peñasquitos pages: kitchen remodeling, bathroom remodeling, ADU renovation, flooring and outdoor remodeling. Or see all Eco projects.

Planning a remodel in Rancho Peñasquitos?

Send the parcel address and project scope. We will confirm the district and the reviews that apply, then return a planning number with a timeline, so you can test both against posted City dates.

Eco Home Builders Inc. · 5560 Ruffin Road, Suite 4, San Diego, CA 92123 · CSLB #1074166 · A+ BBB rating

Sources

  1. City of San Diego, Information Bulletin 100 (review due dates)
  2. City of San Diego, Rapid Review
  3. City of San Diego, Information Bulletin 203 (no-plan building permit)
  4. City of San Diego, Information Bulletin 580 (historical review, October 2020)
  5. City of San Diego, Building Permit Timeline
  6. City of San Diego, Information Bulletin 140 (residential addition and remodel, April 2026)
  7. City of San Diego, Information Bulletin 400 (ADUs and JADUs, January 2026)
  8. City of San Diego, Information Bulletin 146 (school fee exclusions, September 2026)
  9. City of San Diego, Information Bulletin 501 (fee schedule, August 2026)
  10. City of San Diego Planning, impact fees
  11. City of San Diego Fire-Rescue, Very High Fire Hazard Severity Zones
  12. Rancho Peñasquitos Community Plan (September 2021 posting)
  13. San Diego Municipal Code section 142.0640 (impact fee exemptions)
  14. San Diego Municipal Code section 143.0110 (Environmentally Sensitive Lands)
  15. San Diego Municipal Code section 142.0412 (brush management)
  16. San Diego Municipal Code sections 132.1502 and 132.1505 (Airport Land Use Compatibility Overlay Zone)
  17. San Diego Unified, Do I Live Within San Diego Unified School District?
  18. San Diego Unified, School Impact Fees
  19. Poway Unified, Boundaries and District Maps
  20. Poway Unified, Developer Fee Information
  21. California Education Code section 17620
  22. California Government Code section 66317 (ADU review deadlines)
  23. California Government Code section 66311.5 (ADU impact fee rules)
  24. U.S. Census Bureau, American Community Survey table B25035 (ZIP-level housing age)
  25. CSLB guidance on home improvement contracts
  26. CSLB license search
  27. Eco Home Builders, what an ADU costs in San Diego
  28. JLC cost-vs-value tables, Pacific region, 2025 edition

Project counts and cost figures come from Eco Home Builders’ own job records and describe completed projects, not a quote for yours. On 3 of our 27 completed jobs, payments exceeded the final contract value; the ranges are built on contract value. Permit, fee and review rules come from the City, the districts and the state, and they change, so confirm them for your parcel with DSD.