Mission Hills, CA 92103 · Home remodeling
If your Mission Hills house is 45 years old or older, City staff check it for a historical resource before they issue any construction permit that changes the exterior. Of our 17 completed jobs in ZIP 92103 and the nearby City of San Diego ZIPs, 7 are in 92103 itself. 4 of the 6 bathroom remodels across those ZIPs landed between $33K and $36K. Permits come from the City of San Diego’s Development Services Department, since Mission Hills is a neighborhood of the city and not a city of its own. The sections below cover our completed-job numbers, the permit steps, the local rules that change scope and budget, and the ADU rules that apply here.
Mission Hills remodeling at a glance
- Cost, from our completed jobs: 7 of our 17 completed jobs are in ZIP 92103, and only 2 of the 6 bathrooms. 4 of the 6 bathrooms in and around Mission Hills landed between $33K and $36K, and the full bathroom range was $21K to $43K. None of the 4 kitchens is in 92103. The remodel-type range runs from $11K to $714K. See the cost table.
- Who permits: the City of San Diego Development Services Department. Mission Hills is a neighborhood, not its own city. Permit steps and fees.
- A review time: the City’s estimated first review for a Short project is 8 business days, with 6 business days for each recheck. Rapid Review for interior remodels is 6 business days for the first review and 2 for rechecks.
- The rule that changes budgets most: a structure 45 years old or older gets a historical check before a construction permit, typically 10 business days for a ministerial project. Local conditions.
- Where we have built: 7 completed jobs in ZIP 92103, which covers Mission Hills, parts of Hillcrest and Bankers Hill, and 10 more in nearby City of San Diego ZIPs. See the projects.
Planning a project in Mission Hills? Tell us the age of the house, whether the work touches the exterior and what you want to change. We will tell you which review path it likely takes.
Schedule a consultationProjects in and around Mission Hills
7 of our completed projects are in ZIP 92103, which covers Mission Hills, parts of Hillcrest and Bankers Hill. 10 more are in neighboring City of San Diego ZIPs. 2 of the 3 photos below come from an ADU in Hillcrest, from our portfolio. The third is a 92103 remodel, photographed mid-construction.
Hillcrest · 92103
Detached ADU exterior
2-story grey shingle exterior with a wood stair and landing.
See the project photosHillcrest · 92103
ADU bathroom
Floating white vanity with a vessel sink, an oval mirror and wood-look tile.
See the project photosMission Hills · 92103
2-story framing behind a house
Mid-construction framing on a 92103 remodel.
See the project photos| Area | ZIP | Completed | Permit office |
|---|---|---|---|
| Mission Hills, Hillcrest, Bankers Hill | 92103 | 7 (5 remodels, 2 bathrooms) | City of San Diego |
| Downtown, Little Italy | 92101 | 4 (2 bathrooms, 2 kitchens) | City of San Diego |
| Old Town, Morena, Bay Park | 92110 | 1 (bathroom) | City of San Diego |
| Mission Valley | 92108 | 1 (kitchen) | City of San Diego |
| Normal Heights, Kensington | 92116 | 4 (1 remodel, 1 outdoor, 1 bathroom, 1 kitchen) | City of San Diego |
We have no completed jobs in North Park (ZIP 92104), so that ZIP is not in the table. All 5 ZIPs above are inside the City of San Diego and permit through DSD. ZIP 92103 covers Mission Hills, parts of Hillcrest and Bankers Hill.
What our area remodels cost
These are final contract values from Eco projects that are closed or in warranty and at least 80% paid. A final value is the signed contract plus approved change orders and selection upgrades, so it can be higher than the signed contract alone. It leaves out anything a homeowner bought directly. A single neighborhood has too few jobs for a reliable price, so the table covers the 16 remodel-type jobs in ZIP 92103 and the nearby ZIPs.
Final contract values, Eco projects completed in ZIP 92103 and nearby City of San Diego ZIPs, rounded to the nearest $1,000.
Where most landed: $33K–$36K (4 of 6). Full range $21K–$43K.
Each one: $11K, $37K, $103K, $137K. Full range $11K–$137K.
Each one: $11K, $19K, $80K, $120K, $378K, $714K. Full range $11K–$714K.
The outdoor project in ZIP 92116 (Normal Heights, Kensington) came in at $74K. We keep outdoor work out of the cost table, so it is noted here only.
How the 16 remodel-type jobs spread
11 of the 16 came in under $100K. The $74K outdoor job is left out.
- 4 came in at $21K or less. These were the smallest jobs in the set. They include 1 bathroom, 1 kitchen and 2 remodels.
- 6 came in between $33K and $43K. 5 are bathrooms and 1 is a kitchen, at $37K.
- 3 came in between $80K and $120K. A remodel at $80K, a kitchen at $103K and a remodel at $120K.
- 3 came in at $137K or more. A kitchen at $137K and 2 remodels in ZIP 92103, at $378K and $714K.
Scope drives each number. Send us yours and we will place it in one of these buckets. The 2 largest jobs are both in ZIP 92103, but that is 2 jobs, not a pattern we can price for your house.
What moves a budget here is the scope you choose and the changes made after you sign. Final values include change orders and selection upgrades, so the signed number is the starting point. Our process settles design, selections and engineering before the plans go to the City.
ADUs and additions: planning ranges
Our own ADU work across San Diego County is the clearest guide: garage conversions have generally run $100,000 to $200,000, and new ADUs of about 500 sq ft have run $220,000 to $350,000. Site work, utilities, the finish level and fees move a project within those ranges, so we price each one from its drawings. The table adds our published per-square-foot planning range and an independent benchmark for additions. Neither is a quote for your home.
| Project | Planning range | What sits on top in Mission Hills |
|---|---|---|
| Detached or attached ADU | $375–$600 per sq ft for construction, plus $8,000–$25,000 for design | School fee: none at 500 sq ft or less of added space, and $5.38 per sq ft on the whole added space above that. General Plan Maintenance Fee: $737.00. Development Impact Fees: none on an ADU under 750 sq ft, a JADU, or the first 2 ADUs on a premises. If more than two ADUs are proposed, only the two smallest are exempt, and an ADU over 750 sq ft built under the City’s SB 9 rules does not get the first-two exemption. |
| Primary suite addition (24 × 16 ft, about 384 sq ft) | $185,431 midrange; $390,895 for the larger upscale version | The school fee applies only above 500 sq ft of added space, so it does not apply at 384 sq ft. City fees as listed in the permit section. |
| Bathroom addition (6 × 8 ft midrange) | $65,326 midrange; $121,772 for the larger upscale version | Well under 500 sq ft, so no school fee. City fees as listed in the permit section. |
Guides for each type: bathroom remodel costs, kitchen remodel costs, ADU costs and home addition costs.
Want a number for your own home? Tell us the scope, the age of the house and your target budget. We will give you a planning range before you commit to design.
Schedule a consultationHow a Mission Hills permit moves through the City of San Diego
Mission Hills is a neighborhood in the City of San Diego’s Uptown community, not a separate city, so there is no Mission Hills permit office. Permits go through the City’s Development Services Department (DSD), which takes online submittals through its Accela portal.
| Step | What happens | Time |
|---|---|---|
| 1. Historical check | For a structure 45 years old or older, City staff decide whether a potentially significant historical resource exists on the site. There is no over-the-counter option. | Typically 10 business days for a ministerial project, or 20 for a discretionary one. |
| 2. If a resource is found | Every modification and addition is measured against the Secretary of the Interior’s Standards for historic properties. | Not timed separately. The review in step 1 typically takes 10 business days for a ministerial project or 20 for a discretionary one. |
| 3. If no resource is found | The parcel is exempt from further historical review for 5 years. | 5 years. |
| 4. First plan review | DSD publishes estimated due dates for single dwelling units. A Short project is an alteration or addition under 3,000 sq ft with no increase in density. Medium and Long projects take longer. | Estimated 8 business days for Short, 10 for Medium, 15 for Long. Each recheck is 6. The final version is 5. |
| 5. Rapid Review, if eligible | Interior remodels of single dwelling units, including 1 ADU or JADU, and first-floor additions up to 750 sq ft can use Rapid Review. | 6 business days for the first review, 2 for each recheck. |
| 6. Permit validity | A building permit for work on a single-family home expires 3 years after issuance. | 3 years after issuance. |
The table does not list a coastal development permit or a View Assessment step, because either one applies only to some lots. Ask DSD whether your lot is in the Coastal Overlay Zone, and whether either review applies to it, before you plan a schedule around them.
Plan check and setback come up often. A plan check is the City’s review of your drawings against the building and zoning rules. A setback is the distance a structure must keep from a property line.
What permits cost here
These are the City’s published base amounts from Information Bulletin 501 (August 2026). DSD sets the final fee from your plans, so treat them as a starting point, not a quote.
| Fee | Amount |
|---|---|
| General Plan Maintenance Fee, once per project at application (not charged when no plan review is needed) | $737.00 |
| Plan check and inspection, single-dwelling addition or remodel, first 500 sq ft row | Base $3,512.92 plan check plus $2,228.29 inspection |
| Plan check and inspection, larger single-dwelling row, first 3,000 sq ft | Base $8,085.26 plan check plus $8,401.90 inspection |
| State seismic fee, collected with the City permit | 13 cents per $1,000 of valuation |
| State Building Standards fee | $4 per $100,000 of valuation, minimum $1.00 |
| Lead Hazard Prevention fee, if your house was built before 1978 | $58.00 |
| Historical resource review, hourly plan check, charged at permit issuance | $177.68 per hour |
| Plan check at project set-up, for the impact-fee calculation (non-refundable) | Hourly plan check fee, based on 2.5 hours of review time |
| Mapping fee, charged when plans are used for review | $12.16 |
| Fee-collection fee for fees gathered for other agencies, once per project | $17.11 |
| School fee (San Diego Unified, not the City) | $5.38 per sq ft of added space, if the addition is over 500 sq ft |
Illustrations, not quotes. At an assumed valuation of $150,000, the seismic fee is 150 x $0.13 = $19.50, and the Building Standards fee is 150,000 / 25,000 = 6, so $6.00. The City sets valuation from its own schedule, not from your contract price. The flat fees add up to $737.00 + $12.16 + $17.11 = $766.27, or $824.27 for a house built before 1978, before plan check, inspection, historical review, State, impact and school fees.
DSD sets plan check and inspection from your drawings, so we confirm the number at feasibility. Development Impact Fees depend on the project’s type, size and location, and the City’s Citywide DIF calculator takes the parcel number. We do not quote a DIF amount here. Ask DSD for the final figure.
- School fee on added space. San Diego Unified charges $5.38 per square foot of residential construction, under rates effective May 10, 2026. It applies to an addition only when the added space exceeds 500 square feet. For example, 520 square feet at $5.38 comes to $2,798.
The 45-year check follows the structure’s age, not the historic district. A designated district follows Information Bulletin 581 instead. Confirm which one applies before you finalize the design.
A complete first submittal is the most direct way to shorten the wait. Our remodel timeline guide lays out the clocks in more detail.
5 local conditions that change scope and budget
1. Houses 45 years old or older
Once a structure reaches 45 years, City staff must decide whether the parcel holds a potentially significant historical resource before a construction permit is issued. There is no over-the-counter option. If a resource is found, every modification and addition is measured against the Secretary of the Interior’s Standards. If none is found, the parcel is exempt from further review for 5 years.
2. The Mission Hills Historic District
The City’s Historical Resources Board voted 7-0 in July 2007 to designate the Mission Hills Historic District, with a 1908 to 1942 period of significance covering 2 architectural phases. Not every Mission Hills home is in it, and the neighborhood name will not tell you whether yours is. A house inside the district follows Information Bulletin 581 and may take different steps from the 45-year check. Ask DSD to confirm your address before you design.
3. Your scope decides the review path
Interior remodels of single-dwelling homes and first-floor additions up to 750 square feet qualify for Rapid Review: 6 business days for the first review and 2 for each recheck. Everything else follows the standard due dates: 8 business days for a Short project, 10 for Medium and 15 for Long. An addition above 750 square feet is outside Rapid Review, so settle the size and whether the work touches the exterior before you submit.
4. Added space carries a school fee
San Diego Unified charges $5.38 per square foot of residential construction under rates effective May 10, 2026. California lets a school district charge on a residential addition only when the added space exceeds 500 square feet. That makes the size of an addition a budget line on its own: an addition of 500 square feet or less avoids the fee, and a larger one pays on its full area (Education Code section 17620).
5. Canyon-edge lots and narrow streets
The City’s Uptown Community Plan describes Mission Hills as mostly single-family homes on a mesa cut by steep canyons, with mostly quiet, relatively narrow streets. Most of Uptown’s street and lot pattern was set before the automobile. That tells you what to check, not what you will find. On a canyon-edge lot, check slope, truck access, setbacks and what City review will ask for. Test any ADU or addition location against the setbacks in the ADU table. In our experience, a bathroom or kitchen job in an older house can grow into plumbing and foundation work once the walls are open.
ADUs and room additions in Mission Hills
The City’s ADU rules are in Information Bulletin 400, dated January 2026.
| Rule | ADU | Junior ADU (JADU) |
|---|---|---|
| Size | 150 to 1,200 sq ft. 1 ADU of up to 800 sq ft is allowed even where the lot is over its floor area limit. | 150 to 500 sq ft. |
| Side and rear setbacks | An ADU may be built up to the side and rear property lines, with building code fire separation still applying. If it is taller than 16 feet and the neighboring lot is residential, it needs 4-foot side and rear setbacks. | The same setbacks as the house it sits in. |
| Height | Follows the overall maximum height of the base zone and overlay zone. | Built inside the existing or proposed house or an attached garage. |
| Parking | No parking spaces are required outside the Coastal Overlay Zone. Inside it, 1 space applies only in the Beach Impact Area outside a transit priority area, and not if the ADU is 500 sq ft or less or the premises is in a designated historical district. Ask DSD whether your lot is in the zone. | No parking is required. |
| Owner and rentals | The owner does not have to live on site. An ADU may not be leased for less than 31 consecutive days. | The owner must live on site unless the JADU has its own sanitation facilities. |
| Fees | School fees where they apply and the General Plan Maintenance Fee. Development Impact Fees do not apply to an ADU under 750 sq ft, the first 2 ADUs on a premises, or a JADU. If more than two ADUs are proposed, only the two smallest are exempt, and an ADU over 750 sq ft built under the City’s SB 9 rules does not get the first-two exemption. | School fees where they apply and the General Plan Maintenance Fee. |
| Review time | Preapproved plans get a 30-day review. For an ADU on a lot with an existing house, state law requires approval or denial within 60 days of a complete application. | The 60-day state clock is written for ADUs, not JADUs. |
Featured project · Hillcrest · 92103
A detached ADU in Hillcrest, from our portfolio
Three more rooms from the ADU shown at the top of this page: a music room with acoustic wall panels, the entry with a built-in bench, and the living room.
See the project photosIf you are choosing between an ADU and a room addition, our ADU vs. room addition guide compares both, and our ADUs page covers how we run one.
For room additions, our room additions page covers the scope.
How long a Mission Hills remodel takes
A remodel runs on 3 clocks: design, City permit review and construction. The figures below separate what the City publishes from what our jobs were scheduled for.
| Project | City review | Construction (scheduled) |
|---|---|---|
| Bathroom remodel | Short project: 8 business days for the first review, 6 for each recheck. Rapid Review, if eligible: 6 and 2. If the house is 45 years old or older, add a historical check, typically 10 business days. | About 1 week, for 1 job in ZIP 92103 at $21K. That job is an example, not an average. |
| Kitchen remodel | Same review path as a bathroom: 8 and 6 for a Short project, or 6 and 2 under Rapid Review. Add the historical check if the house is 45 years old or older. | About 13 weeks, for 1 job in ZIP 92116, outside Mission Hills. |
| ADU | Preapproved plans: 30-day review. Otherwise the City has 15 business days to say the application is complete, and state law requires a decision within 60 days of a complete application on a lot with an existing house. | No figure yet. |
What homeowners say
We hold a 4.7-star rating on Google across 101 reviews, and more than 300 reviews across Google, Yelp and Houzz. 3 short excerpts, quoted exactly:
“Eco home builders remodeled our whole house in mission hills we are very happy and we recommend using them!”
“Within our 90-year-old historic home, they tastefully built 300- and 400-square-foot units.”
“A bathroom and kitchen remodel in an old house grew into an additional major plumbing replacement and earthquake foundation remodel”
Read all of our Google reviews, including the critical ones.
Only the first review names Mission Hills. The other 2 do not name a neighborhood, so we do not place them here.
How we run your project
We are a design-build firm, so a single team handles design, permits and construction. For a Mission Hills house, the first 2 steps settle the review path: the age of the structure, and whether the work touches the exterior.
- Phone consultationWe talk through what you want to change, your timing and your budget range.
- In-home meetingAn Eco project director walks the house with you, looks at the space and talks through priorities and budget plainly.
- Concept and feasibilityDesign, selections and engineering are resolved before the plans go to the City of San Diego.
- ConstructionInspections at each stage, with progress, photos and decisions documented in Buildertrend.
- Final projectFinal inspection, walkthrough and punch list, and the permit closed out.
What to check before you hire
- Ask about the house’s age first. If the structure is 45 years old or older, the City’s historical check comes before any construction permit that changes the exterior.
- A license you can verify. Look up the number on the CSLB website. Ours is #1074166.
- A legal deposit. California caps a home improvement down payment at $1,000 or 10% of the contract, whichever is less.
- A written permit plan. Ask who submits to DSD, who answers plan-check comments, and who pays the permit and school fees. Put those answers in the contract, not only in conversation.
1. Is the house 45 years old or older? That decides whether the historical check applies.
2. Does the work change the exterior? Interior-only and electrical or plumbing-only work is exempt from the check.
3. Is the house inside the Mission Hills Historic District? Ask DSD, because the district follows Information Bulletin 581.
4. Will any addition add more than 500 square feet? Above that, San Diego Unified’s school fee applies.
5. Does the scope fit Rapid Review? Interior remodels, and first-floor additions up to 750 square feet, can qualify.
Mission Hills remodeling FAQ
My Mission Hills house is over 45 years old. Does that change the permit?
It can. A structure 45 years old or older gets a historical check before a construction permit is issued, typically 10 business days for a ministerial project and 20 for a discretionary one. Interior-only and electrical or plumbing-only work is exempt when the exterior does not change.
Is my home in the Mission Hills Historic District?
The neighborhood name does not tell you. The City’s Historical Resources Board designated the district in July 2007, with a 1908 to 1942 period of significance, but not every Mission Hills home is in it. Ask DSD to confirm your address, because designated districts follow Information Bulletin 581 rather than the 45-year check.
How long does the City of San Diego take to review a remodel?
The estimated first review is 8 business days for a Short project, 10 for Medium and 15 for Long, with 6 per recheck. Rapid Review is 6 business days for the first review and 2 for rechecks. These are the City’s estimates.
What are the red flags of a bad renovation contractor?
Start with the license. Look up the number on the CSLB website. Then check the deposit: California caps a home improvement down payment at $1,000 or 10% of the contract, whichever is less, so a larger up-front payment is a warning sign. Ask who pulls the permit, and get the answer in writing before you sign.
Does an ADU in Mission Hills need parking?
No parking is required for an ADU outside the Coastal Overlay Zone. Inside it, 1 space may be required only in the Beach Impact Area, outside a transit priority area, and not if the ADU is 500 square feet or less or the premises is in a designated historical district. Ask DSD whether your lot is in the Coastal Overlay Zone before you plan around the parking rule.
What is a realistic budget for a kitchen remodel?
Our 4 completed kitchens, none in ZIP 92103, came in at $11K, $37K, $103K and $137K. They are too spread out to average, so treat them as a range. Scope is what moves the number.
Is $10,000 enough to renovate a kitchen?
A kitchen finished at $11K. Scope is what moves the number; give us yours for a planning range.
What does the City charge for a remodel permit?
The City’s published base amounts for a single-dwelling addition or remodel are $3,512.92 plan check and $2,228.29 inspection on the first 500 sq ft row, or $8,085.26 plan check and $8,401.90 inspection on the larger row, which covers the first 3,000 sq ft. The bulletin does not say at what size a project moves to the larger row, so DSD sets the final fee from your plans. Residential fees count the square footage of attached or detached accessory structures, such as patio covers, garages and decks. Add the $737.00 General Plan Maintenance Fee, a non-refundable hourly plan check fee based on 2.5 hours of review time at project set-up, State fees, and any impact or school fees.
Do I pay impact or school fees on an ADU?
A school fee applies to an ADU only when it adds more than 500 square feet of assessable space, and state law exempts one with under 500 square feet of interior livable space. Development Impact Fees do not apply to an ADU under 750 square feet, a JADU, or the first 2 ADUs on a premises. If more than two ADUs are proposed, only the two smallest are exempt, and an ADU over 750 sq ft built under the City’s SB 9 rules does not get the first-two exemption. The $737.00 General Plan Maintenance Fee applies to ADUs and JADUs.
How long does an ADU permit take in San Diego?
For an ADU on a lot with an existing house, the City must say within 15 business days whether the application is complete. A complete application must be approved or denied within 60 days, or it is deemed approved. Preapproved plans get a 30-day review. These are legal limits, not typical times, and the 60-day clock is written for ADUs, not JADUs.
More Mission Hills pages: kitchen remodeling in Mission Hills, bathroom remodeling in Mission Hills and ADU renovation in Mission Hills. Or see all Eco projects.
Planning a remodel in Mission Hills?
A consultation lets us confirm what the City of San Diego will require for your address. You get a planning number and a schedule to check, not a guess.
Eco Home Builders Inc. · 5560 Ruffin Road, Suite 4, San Diego, CA 92123 · CSLB #1074166 · A+ BBB rating
Sources
- City of San Diego, Information Bulletin 100
- City of San Diego, Rapid Review
- City of San Diego, Information Bulletin 580 (October 2020)
- City of San Diego Historical Resources Board, minutes of July 16, 2007
- City of San Diego, Building Permit Timeline
- City of San Diego, Information Bulletin 400 (January 2026)
- San Diego Unified School District, School Impact Fees
- California Education Code section 17620
- California Government Code section 66317
- CSLB, home improvement contract requirements
- CSLB license lookup
- Eco Home Builders, how much an ADU costs in San Diego
- JLC, 2025 Cost vs. Value Report, Pacific region
- City of San Diego, Information Bulletin 501 (August 2026)
- City of San Diego, Information Bulletin 146 (September 2026)
- San Diego Municipal Code section 142.0640
- California Government Code section 66311.5
- City of San Diego, Uptown Community Plan, Chapter 1 (November 2016)
Project counts and cost figures come from Eco Home Builders’ own job records and describe completed projects, not a quote for yours. Permit rules, fees and review times are set by the City of San Diego, San Diego Unified and the State of California, and they change, so confirm them for your parcel with DSD.