You have the dream, We’ll make it Reality.
A Kitchen Heart For Your Home Kitchen Island Installation Installation Of Cabinet Hardware Surface Countertop Installation
San Diego and Orange County Kitchen Remodeling Contractor
You have the dream, We’ll make it Reality.
A Kitchen Heart For Your Home Kitchen Island Installation Installation Of Cabinet Hardware Surface Countertop Installation
Kitchen Remodeling in San Diego
300+ five-star reviews
300+ five-star reviews
Schedule A Free Design Consultation
"*" indicates required fields
Revitalize Your Kitchen with Our Expert Renovations
Top Rated San Diego Kitchen Remodeling Company
Eco Home Builders has remodeled kitchens across San Diego County since 2020, from Kearny Mesa and La Jolla to Encinitas and Chula Vista. Most homeowners come to us with the same three questions: what the kitchen will cost, how long it will be out of use, and whether the work needs a permit.
We answer all three before you sign anything. A mid-range kitchen remodel in San Diego generally runs $45,000 to $85,000, and the construction phase takes four to eight weeks once materials are on site. Any work that moves plumbing, gas, or electrical past its existing location needs a city permit, and we pull it for you.
You get a line-itemed bid that separates labor, materials, and permit fees, a verified CSLB license number, and a project manager on site daily. Cabinetry, countertops, flooring, lighting, and fixtures are selected with our designers at our showroom, so you see and touch every finish before it is ordered.
Our Services
Make Your Kitchen Unique With Custom Features
Adding a few extra custom features can bring everything together and make things stand out. Choosing the right color scheme and pattern will have your kitchen looking amazing! We’ll set up our designers to find the right color scheme for you!
Cabinets
Backsplash
Countertop
Working With Excellent
Our Luxury Kitchen Remodels Include
Eco Home Builders can fulfill all of your home’s kitchen remodeling requests in San Diego.
- Stone countertops with ceramic or glass tile backsplash
- Undermount sink with custom-designed faucet and a water filtration system
- Custom cabinetry with built-in sliding shelves and custom interior accessories
- New general and task lighting
- Updated, technologically-smart appliances
- Floor tiles Installation or upscale flooring
- Freshly painted walls
OUR QUALIFICATIONS
We Provide You With The Full Home Renovation
We specialize in whole house remodeling, room extensions as well as kitchen and bath remodeling. As experienced design and build contractors in San Diego. we ensure to utilize our extensive knowledge and remodeling expertise to turn your goals into a reality. From a simple project to the most complex renovation, our home remodel services cater to your exact needs.
Frequently Asked Questions
How much does a kitchen remodel cost in San Diego?
Kitchen remodel costs in San Diego typically range from $20,000 for a cosmetic refresh to over $100,000 for a full luxury redesign. A mid-range kitchen remodel with new cabinets, countertops, and appliances generally runs $45,000 to $85,000 in 2026. The final number depends on the kitchen’s size, your material selections, and whether structural changes like removing a wall are part of the project. Getting a written, line-item estimate is the only way to know your specific number.
How long does a kitchen remodel take in San Diego?
A full kitchen remodel in San Diego typically takes three to five months from contract signing to a finished, usable kitchen. The construction phase itself usually runs four to eight weeks for mid-range projects. Design selection, permit review (typically three to eight weeks for residential kitchen permits), and material lead times make up much of the overall schedule, so locking in finishes and fixtures early keeps the project on track.
Do I need a permit for a kitchen remodel in San Diego?
Whether a permit is required depends on the scope of work. Cosmetic updates like painting, replacing cabinet doors, swapping out a light fixture in the same location, or replacing appliances generally do not require a permit. However, any work that moves plumbing, adds electrical circuits, relocates gas lines, or alters walls requires a permit from the City of San Diego Development Services Department (DSD). Kitchen permit fees in San Diego typically range from $338 to $3,375 depending on project scope, and review times run three to eight weeks for residential projects.
What are red flags when hiring a kitchen remodeling contractor in San Diego?
Key warning signs: a bid that gives only a single total number without line items for labor, materials, and permits separately; a contractor who cannot provide a CSLB license number verified at cslb.ca.gov; a request for more than 10% or $1,000 upfront before any work begins (California law caps this); a refusal to pull permits; and no written process for change orders. Also ask who will physically be on site: a licensed contractor who subcontracts all work should disclose that and confirm subcontractors are also insured.
What is included in a kitchen remodel?
A full kitchen remodel can include cabinet replacement or refacing, new countertops, tile backsplash, updated plumbing fixtures, new appliances, flooring, lighting, and paint. More extensive remodels add island reconfiguration, layout changes, structural wall removal, and upgraded electrical panels for modern appliances. The scope is defined during the design phase based on your goals and budget.
Can I stay home during a kitchen remodel in San Diego?
Most homeowners stay in their homes during a kitchen remodel. Contractors typically set up a temporary prep station so residents can manage basic meals during construction. Expect dust, noise during working hours, and limited access to the kitchen area. For very large gut remodels, some homeowners choose short-term accommodations for a few weeks, but it is not always necessary.
Which San Diego neighborhoods do you remodel kitchens in?
San Diego County broadly, working from our office and design showroom in Kearny Mesa. That includes La Jolla, Del Mar, Encinitas, Solana Beach, Carlsbad, Rancho Santa Fe, Rancho Bernardo, Rancho Penasquitos, Scripps Ranch, Carmel Valley, Mira Mesa, Poway, Coronado, Point Loma, Chula Vista, La Mesa, El Cajon and Clairemont. Permit review and inspection scheduling differ between the City of San Diego and the unincorporated county, which affects your timeline more than most homeowners expect.
Should I reface my existing cabinets or replace them?
Refacing keeps your existing cabinet boxes and replaces the doors, drawer fronts and visible surfaces. It costs less, takes less time, and makes sense when the boxes are solid and you are happy with the current layout. Replacement is the right call when the boxes are damaged or water stained, when you want to change the layout, or when you want deeper drawers and pull-out storage the old boxes cannot carry. We check the condition of the boxes on the first visit and tell you which one your kitchen actually needs.
How do I choose between quartz and granite countertops?
Quartz is engineered and non-porous, so it never needs sealing and resists staining from wine, oil and citrus without maintenance. Its pattern is consistent, which some homeowners like and others find too uniform. Granite is natural stone, so every slab is different and you should see the actual slab before it is cut. It needs periodic sealing and handles heat better than quartz, which can scorch under a hot pan. Both are durable enough for a family kitchen, so the choice usually comes down to whether you want a predictable pattern or a one of a kind slab.
Can you move my kitchen to another room or open it to the living area?
Yes, and this is where working with a design-build contractor matters. Moving a kitchen means relocating plumbing, gas and electrical, which always requires a City of San Diego permit. Opening a kitchen into a living area usually means removing a wall, and if that wall is load bearing it needs a structural engineer and a beam detailed on the plans. Both are routine work for us, but they change the permit path and the schedule, so they belong in the design phase rather than as a change order halfway through construction.
Will my electrical panel need upgrading for a new kitchen?
Often, yes, and it is better to find out during design than during framing. Many older San Diego homes still run a 100 amp panel, and a modern kitchen asks a lot more of it: dedicated circuits for the refrigerator, dishwasher, disposal and microwave, two small-appliance circuits over the counters, and a 240 volt line if you are moving to an induction range. We run a load calculation before the bid so a panel upgrade appears as a line item from the start, not as a change order after demolition.
What happens if you find something unexpected behind the walls?
It happens, particularly in homes built before the 1980s. Old galvanized supply lines, cast iron drains, knob and tube wiring, dry rot under a window, or a wall that turns out to be load bearing when the drawings said otherwise. When we find something, work stops on that item, we photograph it, we tell you what it is and what the options cost, and nothing proceeds until you approve a written change order. What we do not do is discover it quietly and present it at the end.
Can you work with a designer or architect I have already hired?
Yes. If you already have a designer or an architect you trust, we build to their drawings and coordinate directly with them through permitting and construction. Most of our clients use our in-house design team because it keeps one contract and one point of accountability, but that is a preference, not a requirement. Tell us at the first visit which way you want to work, because it changes how the contract and the schedule are structured.
How do appliance and cabinet lead times affect my schedule?
More than most homeowners expect. Custom cabinetry and specialty tile are the two items that most often push a kitchen past its original date, and a single back-ordered appliance can hold up the countertop template and the final inspection. This is why we lock every selection before demolition rather than during it. If something you want carries a long lead time, you will hear it while you can still change your mind, not after the old kitchen is already on the driveway.
What should I expect from the design phase before construction starts?
Measuring and documenting the existing kitchen, a layout that is tested against how you actually cook, selections made with our designers at the showroom so you see and touch every finish before it is ordered, and a line-itemed bid that separates labor, materials and permit fees. Where something is not yet chosen, it goes into the bid as a defined allowance rather than a vague line. Permit drawings are prepared from that package, which is why changing the layout after plan check is expensive.