University City, CA 92122 · Home remodeling
61 percent of homes in ZIP 92122 are in buildings of 5 or more units, so many remodels here are a single condo or apartment unit. Our 3 completed jobs in that ZIP came in at $185K, $197K and $279K, while 9 others sit in nearby ZIPs. Permits come from DSD, the City of San Diego’s Development Services office. The 45-year historical check can add a review, and time, to any older building.
University City remodeling at a glance
- Our job costs: 12 completed Eco jobs in this set. In ZIP 92122, a kitchen at $185K and remodels at $197K and $279K. Remodels across the set span $124K to $511K. Costs by type.
- Permit office: DSD, which serves the City of San Diego. Permit steps and fees.
- First review: DSD lists 8 business days for a Short-track alteration or addition. Timeline.
- Local rule: buildings 45 years or older face a historical check first. Local conditions.
- Where we have built: 3 jobs in ZIP 92122 and 9 in nearby ZIPs, including Clairemont and La Jolla. See the projects.
Planning a remodel in University City? Give us the parcel and the build year before design starts, since both set the permit path.
Schedule a consultationEco projects in and around University City
ZIP 92122 is the in-city ZIP, and its 3 completed jobs cover University City and UTC. The other 9 completed jobs sit in nearby ZIPs: 6 in Clairemont (92117), 2 in La Jolla (92037) and 1 in Sorrento Valley and Torrey Pines (92121). The table lists only ZIPs where we have finished work. The photos in the cards are examples from other San Diego County jobs, not University City projects.
Example of our work · San Diego County
Oval mirror
Oval mirror over a wood vanity with a tall cabinet. Our one completed bathroom in this set is in ZIP 92121, not in University City.
See more of our projectsExample of our work · San Diego County
Lit box ceiling fixture
Lit box ceiling fixture over a wood and black kitchen. ZIP 92122 has 1 completed kitchen, at $185K.
See more of our projectsExample of our work · San Diego County
Round entry table
Round entry table in front of tall arched windows. ZIP 92117 in Clairemont has 6 completed jobs, the most of any ZIP in this set.
See more of our projects| Area | ZIP | Completed | Permit office |
|---|---|---|---|
| University City and UTC | 92122 | 3 total: 1 kitchen and 2 remodels | DSD for City of San Diego |
| Clairemont | 92117 | 6 jobs: a kitchen, an addition, an outdoor job and 3 remodels | DSD for City of San Diego |
| La Jolla | 92037 | 2 total: 2 remodels | DSD for City of San Diego |
| Sorrento Valley and Torrey Pines | 92121 | 1: 1 bathroom | DSD for City of San Diego |
What our 12 completed jobs cost
These are final contract values for 12 completed jobs: 3 in ZIP 92122 and 9 in nearby ZIPs. A final contract value includes the original signed price, along with approved change orders and selection upgrades. Anything the homeowner bought directly is left out. Read the bars as a short list of real jobs, not a forecast. Six of the 12 jobs had payments above contract value, and one of them is the $197K remodel in ZIP 92122; the ranges use contract value, not what was paid.
Final contract values, Eco projects completed in and around University City, rounded to the nearest $1,000.
Most jobs fell between $197K–$312K (5 of 7). Full range $124K–$511K.
Two jobs: $60K and $185K. Full range $60K–$185K.
A single bathroom came in at $68K and a single addition at $262K, so neither gets a bar. The one outdoor job, at $122K, is left out of the bars because its scope differs.
What the 12 jobs cost, by budget tier
- Under $100K: 2 jobs, a bathroom at $68K and a kitchen at $60K.
- Above $100K, below $262K: 6 jobs. These are the outdoor job at $122K, remodels at $124K, $197K, $208K and $212K, and the $185K kitchen. Two of the three ZIP 92122 jobs sit in this tier: the kitchen and the $197K remodel.
- $262K and up: 4 jobs, the addition at $262K and three remodels at $279K, $312K and $511K.
In our experience, the gap between a $124K remodel and a $511K remodel comes mostly from how far the work reaches into walls, plumbing and roofs, not from the room count.
Planning ranges for ADUs and additions
We do not have enough completed additions in University City to publish a local range, so the table below uses countywide figures.
Our own ADU work across San Diego County is the clearest guide: garage conversions have generally run $100,000 to $200,000, and new ADUs of about 500 sq ft have run $220,000 to $350,000. Site work, utilities, the finish level and fees move a project within those ranges, so we price each one from its drawings. The table adds our published per-square-foot planning range and an independent benchmark for additions. Neither is a quote for your home.
One line to reconcile the two: for a 500 sq ft ADU, that is $375 to $600 per sq ft for construction plus $8,000 to $25,000 for design, before site work and fees, while the $100,000 to $350,000 totals above describe complete projects.
| Project | Planning range | What sits on top in University City |
|---|---|---|
| Detached or attached ADU | $375–$600 per sq ft for construction, plus $8,000–$25,000 for design | A one-time $737.00 City fee. Plan check $3,512.92 and inspection $2,228.29 base amounts apply to a detached ADU up to 500 sq ft. State law bars impact fees on an ADU of 750 sq ft or less. |
| Primary suite addition (24 × 16 ft, about 384 sq ft) | $185,431 midrange; $390,895 for the larger upscale version | From the fee table below: plan check and inspection base amounts. 384 sq ft is under the 500 sq ft line, so no school fee. |
| Bathroom addition (6 × 8 ft midrange) | $65,326 midrange; $121,772 for the larger upscale version | From the fee table below: plan check and inspection base amounts. A 6 × 8 ft addition is far below the school-fee line. |
Our cost guides go deeper on bathrooms, kitchens, ADUs and additions. Their permit sections describe City of San Diego rules, which apply here too.
Need a figure for your own project? Send the parcel, the build year and a short scope list, and we will return a planning range before design work starts.
Schedule a consultationUniversity City permits and fees, step by step
University City and UTC are neighborhoods of the City of San Diego, not separate cities, so the same DSD rules apply across the community. Submittals go through DSD’s online system (Accela), and the track a job lands on depends on its size and type. Before that track begins, a coastal check and a historical check can each add steps.
What needs a permit. Each ADU and JADU requires a building permit with no exemption. A kitchen or bathroom remodel can skip plan review if it leaves structural elements, wall framing and exterior walls alone and adds no plumbing fixtures, though a permit is still issued. Additions and larger remodels follow the track in the table.
| Step | What happens | Time |
|---|---|---|
| 1. Submit | Plans go through DSD’s online submittal system. The track is set in step 4. | Follows step 4. |
| 2. Coastal permit, if the lot is mapped | Inside the Coastal Overlay Zone, a Coastal Development Permit is required in addition to the building permit. | Depends on the parcel. DSD answers by lot. |
| 3. Historical check, for structures 45 years old or older | Staff look for a potentially significant historical resource before a construction permit issues. Interior-only work and electrical or plumbing-only permits are exempt if the exterior does not change. There is no over-the-counter option. | Ministerial projects take 10 business days; discretionary ones take 20. |
| 4. First plan review | Rapid Review covers interior remodels and first-floor additions up to 750 sq ft. Alterations under 3,000 sq ft with no density increase go on the Short track. Bigger or denser jobs land on Medium or Long. | 6 business days on Rapid Review; 8 on Short; 10 on Medium; 15 on Long. |
| 5. Rechecks and final version | Items left out of a submittal return as a recheck with a new clock. The final version is timed separately. | 2 business days per recheck on Rapid Review, 6 on the others. Final version: 5 business days. |
Permits for a single-family home or duplex lapse 3 years after issuance, so keep construction inside that span.
What permits cost in University City
Every amount below is tied to a source. DSD sets the final number from the plans, so treat these as published base figures.
| Fee | Amount or base | Source |
|---|---|---|
| City general plan fee | Charged once per project when you apply: $737.00, non-refundable. Projects with no plan review do not pay it. | Bulletin 501, Aug. 2026 |
| Small single-family job, including an attached ADU or JADU up to 1,100 sq ft and a detached ADU up to 500 sq ft | Plan check $3,512.92 and inspection $2,228.29 for the first 500 sq ft, then $6.98 and $4.46 per added increment. | Bulletin 501, Table 501A |
| Larger single-dwelling job: a detached ADU past 500 sq ft, or an attached unit past 1,100 sq ft | Plan check $8,085.26 and inspection $8,401.90 as starting amounts. The bulletin adds $4.10 and $4.21 past 3,000 sq ft. | Bulletin 501, Table 501A |
| Seismic and Building Standards charges (State) | 13 cents per $1,000 of valuation for seismic, and $4 per $100,000 for Building Standards, with a $1.00 minimum. Valuation is set under IB 101. | Bulletin 501; Bulletin 101 |
| Lead hazard fee | $58.00 if the house was built before 1978. | Bulletin 501, Aug. 2026 |
| Historical plan check | $177.68 an hour, billed when the permit issues. The bulletin gives no hour estimate. | Bulletin 501, Aug. 2026 |
| Mapping fee and agency collection charge | $12.16 mapping fee at plan review. $17.11 at issuance covers fees the City gathers for other agencies, charged once per project. | Bulletin 501, Aug. 2026 |
| Development impact fees | Scaled to the type, size and location of the project under the City’s nexus studies. A non-refundable 2.5-hour plan review charge is added at setup. No dollar figure is published for either. | Bulletin 501; City Planning fee page |
| School fee, San Diego Unified | $5.38 for each sq ft of residential space, in force since May 10, 2026. | District developer fee page |
These figures are a starting point rather than a bill. Electrical, plumbing and mechanical work is priced separately. Impact fees, the school fee and water/sewer fees also sit outside this table, so none of these rows is a full project total.
San Diego Unified sets and collects the school fee, not the City. Under state law, a residential addition that adds 500 sq ft or less of assessable space owes no school fee. Past 500 sq ft, the district charges on all of the added space, not only the excess, and an ADU or JADU under 500 sq ft creates no school fee.
Inside the Coastal Overlay Zone, a Coastal Development Permit is a second approval that comes on top of the building permit. The zone is mapped, so DSD confirms whether a particular lot falls inside it. A lot entirely within the Coastal Commission’s permit jurisdiction gets that permit from the Commission.
A first submittal with gaps returns as a recheck, and each one carries a new due date: 6 business days on the standard tracks, or 2 on Rapid Review. Our remodel timeline guide follows those clocks across a full job.
4 University City conditions that change scope and budget
1. Most homes are in multi-unit buildings
Census figures for ZIP 92122 put 61 percent of homes in buildings of 5 or more units and 24 percent in detached houses. Many remodels here are therefore a single unit inside a larger building. The community plan places the densest housing along La Jolla Village Drive and Nobel Drive, with lower and medium density south of Rose Canyon. Under DSD’s classification, R-2 covers buildings with more than two dwelling units, such as condos and apartments, and R-3 covers a house or a duplex. A kitchen or bathroom remodel in either group that leaves structural elements, wall framing and exterior walls alone and adds no plumbing fixtures can take the no-plan route, which still requires a building permit. DSD’s plan reviewer decides how those rules apply to your unit, so ask before you design.
2. Homes built in 1981 or earlier get a historical check
By Census count, the median home in ZIP 92122 was built in 1986, and 36 percent of homes went up in 1979 or earlier. Any structure at least 45 years old as of 2026, which means built in 1981 or earlier, is subject to a historical check before a construction permit issues. The check still applies to a no-plan remodel when any building on the site is that old. When staff flag a possibly significant resource, the work is checked against the Secretary of the Interior’s Standards for Treatment of Historic Properties. These Census figures describe ZIP code areas rather than neighborhoods, and the median year carries a margin of error of 1 to 2 years.
3. Canyons, fire zones and steep ground
The University plan says fire hazard in the community is concentrated in and around its undeveloped hillsides and canyons, including parts of Rose Canyon and San Clemente Canyon. Whether a parcel sits in a Very High Fire Hazard Severity Zone is mapped lot by lot, so check your address against the City’s map. If the existing building’s permit was deemed complete on or after August 27, 2009, an addition in that zone must follow the state wildland building chapter, CRC section R337, as amended by the City. An addition that reaches into a Brush Management Zone also follows the City’s brush rules. Steep slopes or native habitat on any part of a parcel bring the sensitive-lands rules to the entire parcel.
4. The community plan overlay and the coastal corner
The University plan marks certain sites, mostly villages and transition areas, for a supplemental Community Plan Implementation Overlay Zone. Interior work that adds no floor area and does not change the use is exempt. Anything else on a marked site must match the plan or obtain a Site Development Permit (Process Three). The plan says the Coastal Zone inside the community covers the Torrey Pines State Reserve, the Torrey Pines Golf Course, part of UC San Diego and some research and open-space land in the northwest, but not the residential areas. It also says the Coastal Height Limit Overlay Zone limits new building height in certain areas to protect coastal views. Check your parcel on the City’s maps before you assume either rule applies.
ADUs and room additions in University City
Bulletin 400 (January 2026) is where DSD sets its ADU rules, and state law supplements it. Read both for your parcel, because the zone decides how many units a lot can hold.
| Rule | ADU | Junior ADU (JADU) |
|---|---|---|
| Size | 150 to 1,200 sq ft. An ADU as large as 800 sq ft can exist even on a lot over its floor area limit. | 150 to 500 sq ft. |
| Placement | Detached, attached, or converted from existing floor area or an accessory structure. | Inside a house or an attached garage, whether existing or planned. |
| Setbacks | Side and rear setbacks, plus fire separation rules. A unit taller than 16 ft beside residential land needs 4 ft side and rear setbacks. The lesser-of rule is not yet in effect inside the Coastal Overlay Zone. | Same setbacks as the house. |
| Height | The zone’s and overlay’s height limits apply. On a lot that allows one house, a detached ADU can be two stories at most. | Built inside the house or garage, so no separate height rule applies. |
| Parking | No space outside the Coastal Overlay Zone. Inside it, the Beach Impact Area can require one space when the lot is outside a transit priority area, unless the ADU is 500 sq ft or less or the lot is in a designated historical district. | None required. A converted garage does not need replacement parking, with the same Beach Impact Area exception. |
| Units on one lot | In a single-dwelling-unit zone: 1 new ADU and 1 ADU converted from existing space. | 1 JADU on the same lot. |
| Owner and rentals | The owner does not have to live on site. Leases shorter than 31 consecutive days are not allowed. | The owner must live on site, unless the unit has separate sanitation, or the owner is a government body, a land trust or a qualified housing group. |
| Impact fees | State law: none on an ADU of 750 sq ft or less. City: ADUs under 750 sq ft and the first 2 ADUs on a premises are exempt. | State law: none on a JADU of 500 sq ft or less. City: exempt. |
| Review time | Preapproved plans: 30 days. Otherwise, a completeness letter within 15 business days, then a decision within 60 days of a complete application where a house already stands, or the application is deemed approved. | No state 60-day clock. That statute covers ADUs. |
Featured project · San Diego County
Three rooms from our ADU work
An ADU kitchen with a navy island and woven pendants, an ADU bathroom with a glass shower and wood vanity, and another ADU kitchen with a blue tile backsplash and island. These are examples from San Diego County ADU work, not a University City project.
How we run an ADU projectCheck the zone on the City’s zoning portal before you count units. The densest housing runs along La Jolla Village Drive and Nobel Drive, and the two-ADU-and-JADU pattern in the table assumes a single-dwelling-unit zone. A conversion of an existing accessory structure can keep its setbacks and is not held to the 1,200 sq ft limit, though building code fire separation still applies.
For room additions, the first-floor rule and the Rapid Review path are covered in the permit section above. To compare an ADU with a room addition, read our ADU vs. room addition guide or the room additions page.
How long a University City remodel takes
Design, City review and construction each run on their own clock. Construction cannot start until the permit issues, so the review clock sets the earliest start date. The table shows the build time we have scheduled for one kitchen and one larger remodel, next to DSD’s published review clocks.
| Project | Construction, as scheduled | City review clock |
|---|---|---|
| Kitchen remodel (one job) | Scheduled for about 11 weeks, on one job in ZIP 92122 at $185K. | No-plan permit when nothing structural or plumbing changes. Otherwise Rapid Review, then 2 days per recheck. |
| Larger remodel (one job) | Scheduled for about 10 weeks, on one job in nearby ZIP 92117 at $212K. | Short track 8 business days, Medium 10, Long 15, with each recheck at 6. |
Both figures come from a single job each, so neither is a typical time. For an ADU, preapproved plans take 30 days of review; otherwise a decision is due within 60 days of a complete application, which is the state maximum rather than a typical time. We have no scheduled bathroom or ADU build time in this set, so ask for one in writing before you sign. The City clocks are targets, not promises, and Buildertrend holds each job’s schedule, photo log and decisions, so every change has a date beside it.
What homeowners say
We hold a 4.7-star rating on Google across 101 reviews, and more than 300 reviews across Google, Yelp and Houzz. No Google review so far names University City, so no quotes appear on this page.
Read all of our Google reviews, including the critical ones.
How we run your project
Design, permits and construction sit with one team, so the drawings and the crew come from the same office.
- Phone consultationWe talk through what you want to change, your timing and your budget range.
- In-home meetingAn Eco project director walks the house with you, looks at the space and talks through priorities and budget plainly.
- Concept and feasibilityDesign, selections and engineering are resolved before the plans go to DSD.
- ConstructionEach stage gets an inspection, and progress, photos and decisions are logged in Buildertrend.
- Final projectFinal inspection, walkthrough and punch list, and the permit closed out.
What to check before you hire
- Parcel status in writing first. Before design, ask for a written answer on whether the lot sits in the Coastal Overlay Zone, a community plan overlay site or a fire-hazard zone, and what each one adds.
- A license you can verify. Look up the number on the CSLB website. Ours is #1074166.
- A legal deposit. California caps a home improvement down payment at $1,000 or 10% of the contract, whichever is less.
- A written permit path. Ask for each DSD step for your address, with its track, its time and any historical or coastal review it adds.
1. Does the scope touch exterior walls on a structure at least 45 years old?
2. Is the parcel inside the Coastal Overlay Zone, or on a site the community plan marks for its overlay?
3. Does the lot have steep slopes, native habitat or canyon edges that bring in the Environmentally Sensitive Lands rules?
4. Is the home a condo or apartment unit, and does DSD treat its building as R-2 or R-3?
5. Is the parcel inside a Very High Fire Hazard Severity Zone on the City’s map?
University City remodeling FAQ
Do I need a permit to remodel a University City condo?
Yes. A building permit is still required, even when DSD skips plan review. A kitchen or bathroom remodel that changes no structural elements, wall framing or exterior walls and adds no plumbing fixtures can take the no-plan route. DSD’s plan reviewer decides whether your unit’s building is treated as Group R-2 or R-3.
Is any part of University City in the Coastal Zone?
Some of it is. The University plan places the Torrey Pines State Reserve, the Torrey Pines Golf Course, part of UC San Diego and some research and open-space land in the northwest inside the Coastal Zone. It does not name the residential areas, and DSD or the City’s zoning portal answers for each parcel.
Does the coastal height limit apply to University City?
The plan says a Coastal Height Limit Overlay Zone limits new building height in certain areas of the community. The municipal code’s 30-foot coastal cap reaches inland only as far as Interstate 5’s 1971 alignment, so where a lot sits decides whether it is covered. Only the City’s voters can change the limit.
My University City home backs onto Rose Canyon. Do fire or slope rules apply?
They can. The plan places fire hazard around the community’s hillsides and canyons, including parts of Rose Canyon. Fire zones are mapped by parcel, so check your address on the City’s map. An addition in that zone, on a building whose permit was deemed complete on or after August 27, 2009, must meet CRC section R337 as amended by the City. Steep slopes or native habitat bring in the Environmentally Sensitive Lands rules for the whole lot.
How much does a kitchen remodel cost in University City?
We have 2 completed kitchens in this set, at $60K and $185K. The $185K kitchen is in ZIP 92122. These are final contract values, so approved change orders and selection upgrades are included. Use them as reference points, and read our kitchen remodel cost guide for what moves the number.
Is $300,000 enough to renovate a house in University City?
It depends on the scope. Both remodels we completed in ZIP 92122 came in under $300K, at $197K and $279K. Of the 7 remodels in the set, 3 came in at $279K or more, at $279K, $312K and $511K, so a larger scope can pass $300K.
Can I build an ADU on a University City lot?
Often, but the zone decides how many units fit. In a single-dwelling-unit zone the City allows one new ADU, one ADU converted from existing space and one JADU alongside the house. Every ADU needs a City building permit, and where a house already stands, state law sets a 60-day decision on a complete application.
How long does a University City remodel take?
Our scheduled kitchen here was planned for about 11 weeks, and a larger remodel in nearby ZIP 92117 for about 10 weeks. Those are plans, not results. Add the City review on top: Rapid Review takes 6 business days for a first review and Short takes 8, with 2 or 6 days per recheck. We have no scheduled bathroom or ADU time here, so ask for one in writing.
More University City pages: ADU renovation, bathroom remodeling, kitchen remodeling, outdoor remodeling and flooring remodeling. Or see all Eco projects.
Planning a remodel in University City?
Send us the parcel, the build year and your scope. Before design begins, we review the permit path, the coastal, historical and fire items, and the schedule together.
Eco Home Builders Inc. · 5560 Ruffin Road, Suite 4, San Diego, CA 92123 · CSLB #1074166 · A+ BBB rating
Sources
- DSD Bulletin 100, review due dates
- DSD Rapid Review
- DSD Bulletin 580, historical resources
- DSD Bulletin 203, no-plan permits
- DSD Bulletin 125, Group R-2 and R-3
- DSD building permit timeline
- DSD Bulletin 140, residential additions
- DSD Bulletin 400, accessory units
- DSD Bulletin 501, fees
- DSD Bulletin 146, school fee exclusions
- City Planning fee page
- City Fire-Rescue hazard zone maps
- University Community Plan (2024)
- Overlay zone rules (132.1402)
- Coastal permit rules (126.0702)
- Coastal Overlay Zone map rules (132.0402)
- Coastal height rules (132.0505)
- Sensitive lands rules (143.0110)
- Fee exemptions for units (142.0640)
- District developer fee page
- Education Code 17620
- Government Code 66317
- Government Code 66311.5
- Census year-built table (B25035)
- Cost vs. Value 2025, Pacific
- Eco ADU cost guide
- CSLB license lookup
Project counts and cost figures come from Eco Home Builders’ own job records and describe completed projects, not a quote for yours. Each range is built on contract value rather than amounts paid. Six of the 12 jobs show payments above their contract value, and those payments sit outside every range. Fees, review times and permit rules are set by the City of San Diego, the State and San Diego Unified. They change, so confirm the figures for your parcel before you budget.