Kensington, CA 92116 · Home remodeling
Our four completed projects in ZIP 92116 came in between $11K and $103K, and that ZIP takes in Kensington alongside Normal Heights. Your permit runs through the City of San Diego, since Kensington is part of the city, not a separate municipality. The rule to plan around first is the 45-year historical check (IB 580). Interior-only work with no exterior change is exempt from it, and a designated parcel, one inside an adopted district, or one listed in or determined eligible for the California or National Register follows a different review (IB 581). Below you will find our job numbers, permit steps, local conditions, ADU rules, timing and the questions to settle before you sign.
Kensington remodeling at a glance
- Our completed-job prices: nine remodel-type jobs in ZIP 92116 and neighboring ZIPs run from $11K to $262K. Inside ZIP 92116 the kitchen came to $103K and the bathroom to $43K. Cost ranges.
- Permits: DSD, the City of San Diego’s permit office for every neighborhood in the city. Steps and fees.
- Review time: the City’s guess for a Short project’s first pass is 8 business days, and each recheck about 6. Qualifying interior work can use Rapid Review, at 6 days first and 2 per recheck.
- A rule that can change the budget: houses built in 1981 or earlier face the 45-year check before a permit issues, unless the work is exempt (for example, interior-only with no exterior change). Designated or Register-listed parcels follow IB 581. Local conditions.
- Our footprint here: 4 jobs done in ZIP 92116, 6 in neighboring ZIPs. Projects.
Thinking about work in Kensington? Share the house’s age, whether the exterior is involved and the changes you have in mind. We will say which review path it probably takes.
Schedule a consultationProjects in and around Kensington
Four completed projects sit in ZIP 92116, which takes in Kensington and Normal Heights. Six more sit in neighboring ZIPs: College Area and Talmadge, Del Cerro and San Carlos, and Mission Valley. The photos on this page come from our San Diego County work, not from Kensington.
Example of our work · San Diego County
White cabinets
White cabinets with brass pulls and a tile backsplash. Example from our San Diego County work, not a Kensington job.
See the project photosExample of our work · San Diego County
Marble-look fireplace wall
Marble-look fireplace wall with a linear firebox. Example from our San Diego County work.
See the project photos| Area | ZIP | Completed | Permit office |
|---|---|---|---|
| Kensington and Normal Heights | 92116 | 4 jobs: remodel, outdoor, bathroom, kitchen | San Diego DSD |
| College Area and Talmadge | 92115 | 2: 2 remodels | San Diego DSD |
| Del Cerro and San Carlos | 92120 | 3: 2 remodels, 1 bathroom | San Diego DSD |
| Mission Valley | 92108 | 1: 1 kitchen | San Diego DSD |
ZIP 92116 is shared with Normal Heights, so treat those four jobs as a ZIP count rather than a tally of Kensington houses. Talmadge also extends into ZIP 92115.
What a home remodel costs in Kensington
Each figure below is a final contract value, meaning the signed price plus approved change orders and upgrades. Anything a homeowner bought directly is left out. Only finished projects that are at least 80% paid count. Ten jobs is a small set, so the bars show the nine remodel-type jobs in ZIP 92116 and neighboring ZIPs, and the outdoor job is covered separately.
Final contract values for nine remodel-type Eco projects in ZIP 92116 and neighboring ZIPs, to the nearest $1,000.
Each one: $43K, $126K. Full range $43K–$126K.
Each one: $11K, $103K. Full range $11K–$103K.
Each one: $11K, $27K, $29K, $165K, $262K. Full range $11K–$262K.
The one outdoor job in ZIP 92116 landed at $74K. It stays out of the bars because it is not a remodel-type job.
Where the nine jobs landed
- Four at $29K or under. A kitchen at $11K and remodels at $11K, $27K and $29K.
- One at $43K. A bathroom in ZIP 92116.
- Three between $103K and $165K. A kitchen at $103K in ZIP 92116, a bathroom at $126K in ZIP 92120 and a remodel at $165K in ZIP 92115.
- One at $262K. A remodel in ZIP 92120.
Scope moves these numbers more than room type does, which is why a remodel can land at $11K or at $262K. Tell us what you want changed and we will place it against this set.
Three of our 10 completed jobs have payments above their final contract value, so the figures here are contract values, not what was paid.
ADUs and additions: planning ranges
Our own ADU work across San Diego County is the clearest guide: garage conversions have generally run $100,000 to $200,000, and new ADUs of about 500 sq ft have run $220,000 to $350,000. Site work, utilities, the finish level and fees move a project within those ranges, so we price each one from its drawings. The table adds our published per-square-foot planning range and an independent benchmark for additions. Neither is a quote for your home.
None of the ten completed jobs in this set is an ADU or an addition, so the table below holds planning figures rather than Kensington prices.
| Project | Planning range | What sits on top in Kensington |
|---|---|---|
| Detached or attached ADU | $375–$600 per sq ft for construction, plus $8,000–$25,000 for design | The City’s $737.00 General Plan Maintenance Fee applies, along with any school fee in the fee table. Impact fees are waived for ADUs under 750 sq ft and for the first two on a premises. |
| Primary suite addition (24 × 16 ft, about 384 sq ft) | $185,431 midrange; $390,895 for the larger upscale version | 384 sq ft falls below the 500 sq ft school-fee threshold. City fees follow the permit section. |
| Bathroom addition (6 × 8 ft midrange) | $65,326 midrange; $121,772 for the larger upscale version | Far below the school-fee line. Permit fees are covered in the section above. |
Worked example, for a 500 sq ft ADU: 500 x $375 = $187,500 and 500 x $600 = $300,000 for construction. Adding $8,000 to $25,000 for design gives $195,500 to $325,000. Our finished new ADUs of about 500 sq ft have run $220,000 to $350,000. The two ranges overlap from $220,000 to $325,000, but neither contains the other: the planning range starts $24,500 below the owner’s range, and the owner’s range ends $25,000 above it. Neither is a quote for your home.
Our cost guides go deeper on each type: the bathroom guide, the kitchen guide, the ADU guide and the addition guide.
Want a rough number for the house you own? Share the scope, the house’s age and the budget you have in mind. You will get a planning range before design begins.
Schedule a consultationKensington permits and fees, step by step
Kensington has no permit office of its own. DSD, the City’s Development Services Department, reviews and issues permits for the neighborhood. Submittals go through its online Accela portal. The Mid-City Communities Plan has a Kensington-Talmadge chapter, which we cite below.
Which review applies. Ask two questions in order. First, is the parcel designated, inside an adopted historic district, or listed in or determined eligible for the California or National Register? If so, the review is IB 581, Designated Historical Resource Review: plans go to DSD, Historical Resources staff review them against the Secretary of the Interior’s Standards, and an hourly fee applies (see the fee table). The bulletin gives no review time. Second, if not, is any structure on the parcel 45 years old or older? If so, the 45-year check under IB 580 applies, unless the scope is exempt under San Diego Municipal Code 143.0212. Parcel status is set by address, so ask DSD Historical Resources to confirm.
What needs a permit. An ADU or JADU always needs a building permit. A kitchen or bath job that keeps walls, framing and plumbing layout untouched can bypass plan review, but a permit is still required. Interior-only work, and electrical or plumbing/mechanical-only work with no exterior change, is exempt from the 45-year check.
| Step | What happens | Time |
|---|---|---|
| 1. Historical check | This is the 45-year check under IB 580. Staff look at any structure 45 years old or older before a construction permit issues, to see whether it may be a significant historical resource. Interior-only work, and electrical or plumbing/mechanical-only work, is exempt when the exterior is untouched. No walk-in option exists. | Ministerial work usually takes about 10 business days; discretionary work about 20. |
| 2. A resource is found | The Secretary of the Interior’s Standards become the yardstick for changes and additions. | Part of the review in step 1. |
| 3. No resource found | The parcel is excused from further historical review. | Five years. |
| 4. Plan review | Single dwellings and duplexes get estimated due dates by project tier. Short covers alterations and additions under 3,000 sq ft with no added density. | First review: Short 8, Medium 10, Long 15 business days. Rechecks 6. Final version 5. |
| 5. Rapid Review | Available for interior remodels of a single dwelling, including one ADU or JADU, and for first-floor additions up to 750 sq ft. | First review 6 business days, rechecks 2. |
| 6. Kitchen or bath, no plan review | Covers a house or condo kitchen or bath job with no structural, framing, exterior-wall or new plumbing-fixture work. Where a building on the site is 45 years old or older, plans still go to DSD for historic review unless the scope is exempt under SDMC 143.0212 (interior-only work with no exterior change is one such exemption). | Historic review, when required, usually 10 business days. |
| 7. Permit life | A permit for a single-family home lapses three years after issuance. | Three years. |
Confirm with DSD if your parcel falls inside the Coastal Overlay Zone, because that status sets the ADU parking rule below. Plan check means staff compare your drawings to the building and zoning codes. Setback means the required gap between a structure and a property line.
Permit fees in Kensington
The figures below are the City’s published base amounts in Information Bulletin 501, August 2026. Treat them as starting points, because the final number comes from DSD’s review of your plans.
| Fee | Amount |
|---|---|
| General Plan Maintenance Fee, one charge when you apply. Waived for permits that need no plan review. | $737.00 |
| Plan check and inspection for a home addition or remodel, 500 sq ft tier | Base $3,512.92 for plan check, $2,228.29 for inspection |
| Plan check and inspection, larger project tier (includes a detached ADU over 500 sq ft) | Base $8,085.26 for plan check, $8,401.90 for inspection |
| Seismic fee (State), charged with the City permit | 13 cents for every $1,000 of valuation |
| Building Standards fee (State) | $4 for each $100,000 of valuation, with a $1.00 floor |
| Lead hazard fee, for a house built before 1978 | $58.00 |
| Historical review, billed hourly at permit issuance | $177.68 per hour |
| Impact-fee plan check at project set-up, non-refundable | Based on 2.5 hours of review; the bulletin gives no dollar figure |
| Mapping fee, charged on plans sent for review | $12.16 |
| Collection charge on amounts the City passes along to other agencies, one per project | $17.11 |
| District school fee, set by San Diego Unified | $5.38 per sq ft, effective May 10, 2026, when an addition adds more than 500 sq ft |
Take a sample valuation of $150,000: the seismic charge comes to $19.50 and the Building Standards charge to $6.00. That is arithmetic on a sample figure, since valuation follows the City’s own table and can differ from what you pay a contractor. The three flat charges (General Plan, mapping and fee collection) total $766.27, or $824.27 for a pre-1978 house. Everything beyond those, such as plan check, inspection and the impact and school fees, comes on top.
How much impact fee applies turns on what is built, how big it is and where the parcel sits. The City’s Citywide DIF calculator uses the parcel number, which is the quickest way to see a figure. We leave impact fees out of every number on this page, so ask DSD for the final amount in writing before you commit.
- School fees on added space. San Diego Unified lists ZIP 92116 among the codes it serves in full, so its fee applies to a qualifying Kensington addition. Example: 520 sq ft at $5.38 comes to $2,798. Garages, decks and patios do not count toward school-fee space.
A structure that is 45 years old or older in 2026 was built in 1981 or earlier. For those houses, the 45-year check (IB 580) comes before a construction permit, unless the work is exempt, such as interior-only work with no exterior change. A designated parcel, one inside an adopted district, or one listed in or determined eligible for the California or National Register follows IB 581 instead. Census figures for ZIP 92116 give a median build year of 1968, a rough guide that includes Normal Heights. Confirm the build year from your own paperwork before drawing the plans.
Submitting a complete package on the first try is the surest way to avoid a slow review. The remodel timeline guide breaks down each stage.
Four local conditions that change scope and budget
1. Slopes and sensitive land
The Mid-City plan describes Kensington as a narrow peninsula bounded on three sides by steep slopes, with much of the land in dedicated open space. It calls those slopes an asset to keep natural and also a potential fire hazard. The City’s Environmentally Sensitive Lands rules apply to any premises where sensitive land is present, and a lot with steep hillsides or native habitat in any corner falls under them in full. If your lot has steep slopes or native habitat, ask DSD which process applies before you choose a footprint.
2. Two historic reviews, not one
Of the homes in ZIP 92116, 71 percent date from 1979 or earlier, near the 1981 cutoff. The ZIP includes Normal Heights, so treat that as a broad guide. For most houses here, the 45-year check under IB 580 is the review that applies. A designated parcel, one inside an adopted district, or one listed in or determined eligible for the California or National Register follows IB 581 instead, whatever the house’s age. Two Talmadge districts are designated. Talmadge Gates, a locally designated district (hearing May 25, 2000), covers only historic gates and street lights on Monroe Avenue and 49th Street, not houses. Talmadge Park Estates is a National Register district on Talmadge streets, listed March 25, 2024; its boundaries are approximate, so check your address. The 1998 Mid-City plan calls a Kensington and Talmadge Historic District eligible for designation and Kensington a strong candidate. Eligible is not designated. The City’s 2025 survey and its first draft plan list Kensington Manor and Heights, Kensington Park and Talmadge Park only as potential districts. Talmadge Park, a potential district, is not Talmadge Park Estates, which is the National Register district. The plan update is a first draft from August 2026 and is not adopted, so the 1998 plan and City code still govern. Ask DSD Historical Resources to confirm your parcel by address.
3. Fire-zone rules for additions
The City’s fire-hazard map is drawn parcel by parcel, so your address decides the answer. Where the existing building’s permit application was deemed complete on or after August 27, 2009, an addition or alteration inside a Very High Fire Hazard Severity Zone must meet California Residential Code section R337 as the City has amended it. Additions that encroach on a Brush Management Zone also follow the brush rules. R337 governs vents, roofing, siding and decking, so material choices can shape the scope.
4. Talmadge’s streets and rear garages
Talmadge was established in 1925 and dedicated in January 1926. The City’s plan says some of its streets are named after the Talmadge sisters, silent film stars, and that homes sit on narrow streets with garages at the rear of the lot or off alleys. Not every lot has an alley, so check yours. Converting an existing garage can keep its setbacks, but fire separation still applies and may require changes. Talmadge also extends into ZIP 92115.
ADUs and junior ADUs in Kensington
The City’s ADU rules are set out in Information Bulletin 400 (January 2026). State law governs the review clock and the impact-fee limits. State ADU law keeps changing, so verify the current code for your parcel before you design.
| Rule | ADU | Junior ADU (JADU) |
|---|---|---|
| Floor area | 150 to 1,200 sq ft | 150 to 500 sq ft, carved from the house or an attached garage |
| Setbacks | Side and rear lines work with fire separation in place. Taller than 16 feet beside a residential lot calls for 4-foot side and rear setbacks. Inside a Very High Fire Hazard Severity Zone, the 4-foot figure governs at any height. | Same as the primary house. |
| Height and stories | The zone’s overall height limit governs. On single-dwelling lots, a detached ADU tops out at two stories. | Sits within the house or attached garage. |
| Parking | Outside the Coastal Overlay Zone, parking is not required. Inside it, one space is possible only within the Beach Impact Area of the Parking Impact Overlay, outside a transit priority area, and never when the ADU is 500 sq ft or smaller or sits in a designated historical district. | None. Garage conversions need no replacement spaces, except in that Beach Impact Area case. |
| Occupancy | No owner-occupancy requirement. Leases must run at least 31 consecutive days. | Owner occupancy required, except where the JADU has separate sanitation. |
| Fees | $737.00 General Plan Maintenance Fee, plus school fees where they apply. Development Impact Fee exemptions cover an ADU under 750 sq ft and the first two ADUs. | $737.00 General Plan Maintenance Fee, plus school fees where they apply. No Development Impact Fee. |
Featured project · San Diego County
An ADU kitchenette, bedroom and bath
The three photos show a kitchenette with a wood-top table and stainless fridge, a bedroom with green curtains and a ceiling fan, and a bathroom with patterned floor tile and a glass shower. They are examples of our San Diego County ADU work, not a Kensington project.
How we run an ADU projectOn a lot that already has a house, the City must tell you within 15 business days whether an ADU application is complete. Once it is complete, state law gives the City 60 days to approve or deny it, and if it does not, the application counts as approved. Plans preapproved by the City move through a 30-day review. These figures are outer limits; the 60-day clock applies to ADUs and does not reach JADUs.
A single-dwelling lot can hold the house, one new ADU, one converted ADU and one JADU. Your zoning decides the actual count, so confirm it on the City’s zoning portal.
Choosing between an ADU and an addition? Our ADU vs. room addition guide compares the two, and our ADUs page explains how we deliver one. Room additions have their own scope rules, covered on our room additions page.
How long a Kensington remodel takes
Three clocks run on every job: design, City review and construction. The table shows what our jobs were scheduled for. Scheduled and actual are different measures, and each row describes a single job.
| Project | Construction (scheduled) |
|---|---|
| Kitchen remodel | About 13 weeks, one job in ZIP 92116 at $103K |
| Smaller remodel | About 3 weeks, one job at $27K in ZIP 92115 |
| Larger remodel | About 20 weeks, one job at $165K in ZIP 92115 |
City review adds its own clock: roughly 8 business days for a Short project’s first pass, about 6 per recheck, or Rapid Review at 6 and 2. Houses 45 years old or more that get exterior work also face a historical check, roughly 10 business days. Buildertrend keeps the schedule, photos and selections for each job, so you can follow progress stage by stage.
What homeowners say
Our Google rating is 4.7 stars across 101 reviews, and more than 300 reviews appear across Google, Yelp and Houzz. No Google review we have names Kensington, so this page quotes none and credits none to the neighborhood.
Read all of our Google reviews, including the critical ones.
How we run your project
One design-build team carries design, permits and the build. For a house in Kensington, the first two steps decide the review path: the structure’s age, and whether exterior work is part of the job.
- Phone consultationWe talk through what you want to change, your timing and your budget range.
- In-home meetingAn Eco project director walks the house with you, looks at the space and talks through priorities and budget plainly.
- Concept and feasibilityDesign, selections and engineering are resolved before the drawings are filed with DSD.
- ConstructionEvery stage is inspected, and Buildertrend records progress, photos and each decision.
- Final projectFinal inspection, walkthrough and punch list, and the permit closed out.
What to check before you hire
- Confirm the house’s age and the exterior scope first. A structure 45 years old or older meets the 45-year check unless the work is exempt, such as interior-only work with no exterior change.
- A license you can verify. Look up the number on the CSLB website. Ours is #1074166.
- A legal deposit. California caps a home improvement down payment at $1,000 or 10% of the contract, whichever is less.
- Permit paperwork in writing. Before signing, settle which party files with DSD, which answers plan-check comments and which pays the City and school fees, and attach those answers to the contract.
1. Is the house 45 years old or older, meaning built in 1981 or earlier? If so, the 45-year check is in play.
2. Does the scope touch the exterior? Interior-only work with no exterior change is exempt from the 45-year check.
3. Is the parcel designated, inside an adopted historic district, or listed in or determined eligible for the California or National Register? If so, IB 581 applies instead of the 45-year check. Ask DSD Historical Resources by address.
4. Does the lot have steep hillsides or sensitive habitat? If any part does, the whole lot is covered.
5. Will an addition or ADU add more than 500 sq ft of assessable space? Above that line, the school fee applies to all of it.
Kensington remodeling FAQ
Is my Kensington house in a historic district?
There are two separate reviews, and the parcel decides which one applies. A designated parcel, one inside an adopted historic district, or one listed in or determined eligible for the California or National Register goes to IB 581. Otherwise a house 45 years old or older goes through the 45-year check under IB 580. Ask DSD Historical Resources to confirm your address.
My Kensington home is over 45 years old. What happens to my permit?
Staff look at whether a historical resource may exist before a construction permit issues. The review usually takes 10 business days for ministerial work and 20 for discretionary work, with no walk-in option. If nothing is found, the parcel is excused from further historical review for five years. Interior-only work with no exterior change is exempt from the 45-year check, so this review does not reach it.
My Kensington or Talmadge lot is next to a canyon. Do slope and fire rules change my remodel?
They can. Steep hillsides or sensitive habitat anywhere on the lot bring the Environmentally Sensitive Lands rules to the whole parcel. In a mapped Very High Fire Hazard zone, an addition or alteration must meet California Residential Code section R337 as amended by the City. Zone maps are drawn by parcel, so check your address.
Can I build an ADU on a Talmadge lot with an alley or rear garage?
Often yes, but check the lot first. Beside a residential lot, an ADU taller than 16 feet needs 4-foot side and rear setbacks, and in a Very High Fire Hazard Severity Zone that setback applies at any height. A converted garage can keep its existing setbacks, though fire separation still applies. Not every Talmadge lot has an alley.
What happened to the Mid-City planned district rules?
The Mid-City Communities Planned District, which covered the Mid-City plan area including Kensington-Talmadge, was repealed effective January 15, 2017. Citywide zoning and overlay rules now apply. Your lot’s current zoning is on the City’s zoning portal.
How much does a kitchen remodel cost in Kensington?
We have two completed kitchens in the set: $103K in ZIP 92116 and $11K in ZIP 92108. Two jobs cannot make an average, so read them as a range. Scope decides where a project lands.
Is $300,000 enough to renovate a house in Kensington?
A $300,000 budget sits above every remodel-type job in this set. All nine of our remodel-type jobs in ZIP 92116 and neighboring ZIPs came in under $300,000. The five remodels ranged from $11K to $262K, and the middle half of them ran from $27K to $165K. Our highest remodel was $262K, so this set cannot show what a larger house would cost. Final values also count approved change orders and upgrades, so the scope you pick determines where a job lands.
How long does the City take to review a remodel?
Expect an estimated 8 business days for the first look at a Short project, with 6 days per recheck. When a job qualifies, Rapid Review runs 6 days for the first look and 2 for each recheck. These are the City’s estimates, not commitments.
More Kensington pages: ADU renovation, bathroom remodeling, kitchen remodeling and outdoor remodeling. Or browse all Eco projects.
Planning a remodel in Kensington?
We check the review path for your address, confirm whether the 45-year check applies, and price the design once the City’s requirements are clear. You leave with a planning range and a list of questions for DSD.
Eco Home Builders Inc. · 5560 Ruffin Road, Suite 4, San Diego, CA 92123 · CSLB #1074166 · A+ BBB rating
Sources
- IB 100 (plan review due dates)
- Rapid Review
- IB 580 (historical review, October 2020)
- IB 203 (no-plan kitchen and bath permit, July 2024)
- Building Permit Timeline
- IB 501 (fee schedule, August 2026)
- IB 146 (school fee exclusions, September 2026)
- IB 140 (residential addition and remodel, April 2026)
- IB 400 (ADUs, January 2026)
- Mid-City Communities Plan, Kensington-Talmadge chapter
- San Diego Municipal Code 143.0110, Environmentally Sensitive Lands
- San Diego Municipal Code 142.0640, Development Impact Fees
- San Diego Municipal Code Chapter 15, Article 12 (Mid-City planned district, repealed)
- Fire-Rescue, Fire Hazard Severity Zones
- San Diego Unified, School Impact Fees
- San Diego Unified, school boundary lookup
- California Education Code 17620
- California Government Code 66317
- California Government Code 66311.5
- Planning, Impact Fees
- CSLB, contract requirements for home improvements
- CSLB license check
- Eco Home Builders, ADU cost planning range
- JLC, 2025 Cost vs. Value Report, Pacific region
- IB 581 (Designated Historical Resource Review, October 2020)
- San Diego Municipal Code 143.0212, historical resources survey exemptions
- City of San Diego Planning, Mid-City Communities Plan update (draft, August 2026)
- Mid-City Focused Reconnaissance Survey Report, public review draft (2025)
- National Park Service, National Register weekly list (March 2024)
- City of San Diego Historical Resources Inventory, Talmadge Gates (HRB 422)
These figures come from Eco Home Builders’ completed-job records and describe finished projects, not a quote for yours. Three of our 10 completed jobs have payments above final contract value. The City, San Diego Unified and the State set the rules and fees here, and those change, so check them for your parcel with DSD.